General Visual Inspection of Vertical Stabilizer Leading Edge (EWIS)
TASK 05-23-20-200-002-A
General Visual Inspection of Vertical Stabilizer Leading Edge (EWIS)
Refer to the MPD TASK: ZL-322-01
GENERAL VISUAL INSPECTION OF VERTICAL STABILIZER LEADING EDGE (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-23-20-010-051-A
Subtask 05-23-20-210-051-A
Subtask 05-23-20-410-051-A
[Rev.10 from 2021]
2026.03.31 22:49:32 UTC
General Visual Inspection of Vertical Stabilizer Leading Edge (EWIS)
ZONE: 322
1. Reason for the JobRefer to the MPD TASK: ZL-322-01
GENERAL VISUAL INSPECTION OF VERTICAL STABILIZER LEADING EDGE (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 6M (20 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 322 | VERTICAL STABILIZER LEADING EDGE |
| 322AL, 322BL, 322CL |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 55-32-11-000-001-A | Removal of the Vertical Stabilizer Leading-Edge |
| TASK 55-32-11-400-001-A | Installation of the Vertical Stabilizer Leading-Edge |
Subtask 05-23-20-010-051-A
A. Get Access
(1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 320.
(2) Remove the access panels 322AL, 322BL and 322CL
(Ref. AMM TASK 55-32-11-000-001).
4. Procedure(1) Put the ACCESS PLATFORM 6M (20 FT) in position at zone 320.
(2) Remove the access panels 322AL, 322BL and 322CL
(Ref. AMM TASK 55-32-11-000-001).
Subtask 05-23-20-210-051-A
A. Inspection
(1) Do a general visual inspection of the vertical-stabilizer leading edge (zone 322).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the vertical-stabilizer leading edge (zone 322).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
Subtask 05-23-20-410-051-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 322AL, 322BL and 322CL
(Ref. AMM TASK 55-32-11-400-001).
(3) Remove the access platform(s).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the access panels 322AL, 322BL and 322CL
(Ref. AMM TASK 55-32-11-400-001).
(3) Remove the access platform(s).
Vertical-Stabilizer Leading-Edge Area