General Visual Inspection of Underfloor Bay of Aft Cargo Compartment (EWIS)
TASK 05-21-50-200-002-A
General Visual Inspection of Underfloor Bay of Aft Cargo Compartment (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-153-01
GENERAL VISUAL INSPECTION OF UNDERFLOOR BAY OF AFT CARGO COMPARTMENT (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-21-50-010-051-A ** ON A/C NOT FOR ALL
Subtask 05-21-50-210-051-A
Subtask 05-21-50-420-052-B ** ON A/C NOT FOR ALL Subtask 05-21-50-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 22:48:51 UTC
General Visual Inspection of Underfloor Bay of Aft Cargo Compartment (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-153-01
GENERAL VISUAL INSPECTION OF UNDERFLOOR BAY OF AFT CARGO COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 153 | U/FLOOR BAY OF AFT CARGO COMPARTMENT |
| 154 | U/FLOOR BAY OF AFT CARGO COMPARTMENT |
| 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 28-11-27-000-001-A | Removal of the Additional Center Tank (ACT) |
| TASK 28-11-27-400-001-A | Installation of the Additional Center Tank (ACT) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 53-42-14-000-001-A | Removal of the Aft Cargo-Compartment Floor-Panels Zone 150 |
| TASK 53-42-14-400-001-A | Installation of the Aft Cargo-Compartment Floor-Panels Zone 150 |
| TASK 53-42-14-400-001-A-01 | Installation of the Aft Cargo-Compartment Floor-Panels (Alternative Installation Procedure with the Skyflex Option) |
Subtask 05-21-50-010-051-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 154.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the floor panels between FR46 and FR59
(Ref. AMM TASK 53-42-14-000-001).
Subtask 05-21-50-010-051-B ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 154.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the floor panels between FR46 and FR59
(Ref. AMM TASK 53-42-14-000-001).
A. Get Access
(1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 154.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the floor panels between FR47.2 and FR59
(Ref. AMM TASK 53-42-14-000-001).
Subtask 05-21-50-020-052-B ** ON A/C NOT FOR ALL (1) Put the ACCESS PLATFORM 2M (6 FT) in position at zone 154.
(2) Open aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the floor panels between FR47.2 and FR59
(Ref. AMM TASK 53-42-14-000-001).
B. Removal of the Additional Center Tank (ACT)
(1) Remove the ACT, if installed (Ref. AMM TASK 28-11-27-000-001).
4. Procedure(1) Remove the ACT, if installed (Ref. AMM TASK 28-11-27-000-001).
Subtask 05-21-50-210-051-A
A. Inspection
Underfloor Bay Area of the Aft Cargo Compartment ** ON A/C NOT FOR ALL
Underfloor Bay Area of the Aft Cargo Compartment ** ON A/C NOT FOR ALL
Underfloor Bay Area of the Aft Cargo Compartment ** ON A/C NOT FOR ALL
(1) Do a general visual inspection of the underfloor bay of the aft cargo compartment (zones 153 and 154).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting and piping) are correctly attached.
5. Close-up
Underfloor Bay Area of the Aft Cargo Compartment ** ON A/C NOT FOR ALL
Underfloor Bay Area of the Aft Cargo Compartment ** ON A/C NOT FOR ALL
Underfloor Bay Area of the Aft Cargo Compartment ** ON A/C NOT FOR ALL (2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting and piping) are correctly attached.
Subtask 05-21-50-420-052-B ** ON A/C NOT FOR ALL Subtask 05-21-50-410-051-A ** ON A/C NOT FOR ALL
B. Close Access
(1) Install the floor panels between FR46 and FR59
(Ref. AMM TASK 53-42-14-400-001).
(2) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).
Subtask 05-21-50-410-051-B ** ON A/C NOT FOR ALL (1) Install the floor panels between FR46 and FR59
(Ref. AMM TASK 53-42-14-400-001).
(2) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).
B. Close Access
(1) Install the floor panels between FR47.2 and FR59
(Ref. AMM TASK 53-42-14-400-001).
(2) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).
(1) Install the floor panels between FR47.2 and FR59
(Ref. AMM TASK 53-42-14-400-001).
(2) Close aft cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).