GENERAL VISUAL INSPECTION OF BAY BEHIND FWD CARGO COMPARTMENT (EWIS)
TASK 05-21-30-200-003-A
GENERAL VISUAL INSPECTION OF BAY BEHIND FWD CARGO COMPARTMENT (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-137-01
GENERAL VISUAL INSPECTION OF BAY BEHIND FWD CARGO COMPARTMENT (EWIS)
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 05-21-30-010-052-A
Subtask 05-21-30-210-052-A
Subtask 05-21-30-410-052-A
[Rev.10 from 2021]
2026.03.31 22:48:40 UTC
GENERAL VISUAL INSPECTION OF BAY BEHIND FWD CARGO COMPARTMENT (EWIS)
1. Reason for the Job
Refer to the MPD TASK: ZL-137-01
GENERAL VISUAL INSPECTION OF BAY BEHIND FWD CARGO COMPARTMENT (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 137 | BAY BETW AFT PART. BULKHEAD OF FWD CARGO |
| 138 | BAY BETW AFT PART. BULKHEAD OF FWD CARGO |
| 825 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-400-001-A | Installation of the Forward Cargo-Compartment Partition |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 06-41-53-00 | FUSELAGE-DESCRIPTION AND OPERATION |
Subtask 05-21-30-010-052-A
A. Get Access
(1) Put an ACCESS PLATFORM 2M (6 FT) in position at the zones 137 and 138.
(2) Open the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the FWD cargo-compartment partition-panels at FR34 or FR35.5 (Ref. AMM TASK 25-54-12-000-001). (For access location see (Ref. AMM D/O 06-41-53-00) zone 131-132).
4. Procedure(1) Put an ACCESS PLATFORM 2M (6 FT) in position at the zones 137 and 138.
(2) Open the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-001).
(3) Remove the FWD cargo-compartment partition-panels at FR34 or FR35.5 (Ref. AMM TASK 25-54-12-000-001). (For access location see (Ref. AMM D/O 06-41-53-00) zone 131-132).
Subtask 05-21-30-210-052-A
A. Inspection
(1) Do a general visual inspection of the bay behind the forward cargo compartment (Zones 137 and 138).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up(1) Do a general visual inspection of the bay behind the forward cargo compartment (Zones 137 and 138).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
NOTE: Lift the insulation blankets sufficiently to complete a correct general visual inspection as necessary.
Subtask 05-21-30-410-052-A
A. Close Access
(1) Install the FWD cargo-compartment partition-panels at FR34 or FR35.5 (Ref. AMM TASK 25-54-12-400-001). (For access location see (Ref. AMM D/O 06-41-53-00) zone 131-132).
(2) Close the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).
(1) Install the FWD cargo-compartment partition-panels at FR34 or FR35.5 (Ref. AMM TASK 25-54-12-400-001). (For access location see (Ref. AMM D/O 06-41-53-00) zone 131-132).
(2) Close the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(3) Remove the access platform(s).