W DOC AIRBUS | TSM A320F

Loss of the Feedback Signal on the Channel A of the HPTCC Valve on Engine 1


TASK 75-21-00-810-809-A
Loss of the Feedback Signal on the Channel A of the HPTCC Valve on Engine 1


1. Possible Causes
  • High Pressure Turbine Clearance Control (HPTCC) Valve
  • ECU [4000KS]
  • harness J11
  • harness CJ11R
  • harness HJ11
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
AMM 73-21-50-000-002
Removal of the CJ11R Harness
AMM 73-21-50-000-010
Removal of the J11 Harness
AMM 73-21-50-000-026
Removal of the CJ11R Harness for SAC Engines
AMM 73-21-50-000-044
Removal of the HJ11 Harness for SAC Engines
AMM 73-21-50-400-002
Installation of the CJ11R Harness
AMM 73-21-50-400-010
Installation of the J11 Harness
AMM 73-21-50-400-026
Installation of the CJ11R Harness for SAC Engines
AMM 73-21-50-400-044
Installation of the HJ11 Harness for SAC Engines
AMM 73-21-60-000-001
Removal of the Electronic Control Unit (ECU)
AMM 73-21-60-400-001
Installation of the Electronic Control Unit (ECU)
AMM 73-29-00-710-040
Operational Test of the FADEC on the ground (with Engine Motoring)
AMM 75-21-10-000-001
Removal of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
AMM 75-21-10-000-002
Removal of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
AMM 75-21-10-400-001
Installation of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
AMM 75-21-10-400-002
Installation of the High Pressure Turbine Active Clearance Control (HPTACC) Valve
3. Fault Confirmation
Subtask 75-21-00-710-066-A ** ON A/C NOT FOR ALL
A. Test
   (1) Do the operational test of the FADEC 1 on the ground with engine non motoring AMM 73-29-00-710-040.
4. Fault Isolation
Subtask 75-21-00-810-062-A ** ON A/C NOT FOR ALL
A. This failure message is triggered when there is a disagreement between channels A and B position signal from the HPTCC Valve or the signal is out of range.
   (1) If the failure message HPTC VLV, J11, ECU is not confirmed:
     (a) No maintenance action required.
   (2) If the failure message HPTC VLV, J11, ECU is not confirmed but is repetitive:
     (a) Do the following trouble shooting at next maintenance opportunity:
       1 If the fault continues:
NOTE: Tighten the connector by hand plus one eighth of a turn. If necessary use soft nose pliers.
   (3) If the failure message HPTC VLV, J11, ECU is confirmed:
     (a) Disconnect the harness J11 from the ECU and do a resistance check of the harness J11 between:
. pins 34 and 35 (68 to 102 Ohms)
. pins 18 and 36 (30 to 42 Ohms)
. pins 16 and 33 (22 to 30 Ohms)
. pins 34 and 17 (>10 Megohms)
. pins 18 and 17 (> 10 Megohms)
. pins 16 and 17 (> 10 Megohms)
. pin 34 and the ground (> 10 Megohms)
. pin 18 and the ground (> 10 Megohms)
. pin 16 and the ground (> 10 Megohms).
       1 If the resistance values are in the specified limits:
       2 If the resistance values are not in the specified limits:
  • disconnect the harness CJ11R from the HPTCC Valve and do a resistance check of the HPTCC Valve between:
    . pins 2 and 3 (68 to 102 Ohms)
    . pins 4 and 5 (30 to 42 Ohms)
    . pins 6 and 7 (22 to 30 Ohms)
    . pin 2 and the ground (> 10 Megohms)
    . pin 4 and the ground (> 10 Megohms)
    . pin 6 and the ground (> 10 Megohms).
       3 If the resistance values are not in the specified limits:
       4 If the resistance values are in the specified limits:
  • disconnect the harness J11 from the harness CJ11R at the 6 o'clock junction box and do a check of the resistance of the harness CJ11R between:
    . pins 29 and 30 (68 to 102 ohms)
    . pins 18 and 31 (30 to 42 ohms)
    . pins 16 and 28 (22 to 30 ohms)
    . pins 29 and 17 (> 10 Megohms)
    . pins 18 and 17 (> 10 Megohms)
    . pins 16 and 17 (> 10 Megohms)
    . pin 29 and the ground (> 10 Megohms)
    . pin 18 and the ground (> 10 Megohms)
    . pin 16 and the ground (> 10 Megohms).
         a If the resistance values are in the specified limits:
         b If the resistance values are not in the specified limits:
NOTE: Tighten the connector by hand plus one eighth of a turn. If necessary use soft nose pliers.
Subtask 75-21-00-810-062-B ** ON A/C NOT FOR ALL
A. This failure message is triggered when there is a disagreement between channels A and B position signal from the HPTCC Valve or the signal is out of range.
   (1) If the failure message HPTC VLV, J11, ECU is not confirmed:
     (a) No maintenance action required.
   (2) If the failure message HPTC VLV, J11, ECU is not confirmed but is repetitive:
     (a) Do the following trouble shooting at next maintenance opportunity:
       1 If the fault continues:
NOTE: Tighten the connector by hand plus one eighth of a turn. If necessary use soft nose pliers.
   (3) If the failure message HPTC VLV, J11, ECU is confirmed:
     (a) Disconnect the harness HJ11 from the ECU and do a resistance check of the harness HJ11 between:
. pins 34 and 35 (68 to 102 Ohms)
. pins 18 and 36 (30 to 42 Ohms)
. pins 16 and 33 (22 to 30 Ohms)
. pins 34 and 17 (> 10 Megohms)
. pins 18 and 17 (> 10 Megohms)
. pins 16 and 17 (> 10 Megohms)
. pin 34 and the ground (> 10 Megohms)
. pin 18 and the ground (> 10 Megohms)
. pin 16 and the ground (> 10 Megohms).
       1 If the resistance values are in the specified limits:
       2 If the resistance values are not in the specified limits:
  • disconnect the harness CJ11R from the HPTCC Valve and do a resistance check of the HPTCC Valve between:
    . pins 2 and 3 (65 to 99 Ohms)
    . pins 4 and 5 (23 to 40 Ohms)
    . pins 6 and 7 (18 to 29 Ohms)
    . pin 2 and the ground (> 10 Megohms)
    . pin 4 and the ground (> 10 Megohms)
    . pin 6 and the ground (> 10 Megohms).
       3 If the resistance values are not in the specified limits:
       4 If the resistance values are in the specified limits:
  • disconnect the harness HJ11 from the harness CJ11R at the 6 o'clock junction box and do a check of the resistance of the harness CJ11R between:
    . pins 29 and 30 (68 to 102 ohms)
    . pins 18 and 31 (30 to 42 ohms)
    . pins 16 and 28 (22 to 30 ohms)
    . pins 29 and 17 (> 10 Megohms)
    . pins 18 and 17 (> 10 Megohms)
    . pins 16 and 17 (> 10 Megohms)
    . pin 29 and the ground (> 10 Megohms)
    . pin 18 and the ground (> 10 Megohms)
    . pin 16 and the ground (> 10 Megohms).
         a If the resistance values are in the specified limits:
         b If the resistance values are not in the specified limits:
NOTE: Tighten the connector by hand plus one eighth of a turn. If necessary use soft nose pliers.
Subtask 75-21-00-710-067-A ** ON A/C NOT FOR ALL
B. Do the test given in Para. 3.
   (1) No additional maintenance action is required if the fault is not confirmed.
   (2) Continue the fault isolation procedure if the fault continues.
[Rev.8 from Aug 2018] 2026.04.04 04:37:01 UTC