Failure of the Gate Valve 3YA
TASK 47-11-00-810-802-A
Failure of the Gate Valve 3YA
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 47-11-00-740-052-A ** ON A/C NOT FOR ALL 4. Fault Isolation
Subtask 47-11-00-810-051-A ** ON A/C NOT FOR ALL
[Rev.8 from Aug 2018]
2026.04.04 04:34:22 UTC
Failure of the Gate Valve 3YA
1. Possible Causes
- ISOL VALVE-CSAS FROM IGGS [3YA]
wiring from IGGS CLT UNIT (1YA) pin A/7 to GATE VLV (3YA) pin A/1 wiring from IGGS CLT UNIT (1YA) pin A/36 to GATE VLV (3YA) pin A/2 wiring from IGGS CLT UNIT (1YA) pin A/59 to GATE VLV (3YA) pin A/4 wiring from ground to GATE VLV (3YA) pin A/5
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| ASM 471101 | |
| AMM 47-21-41-000-001 | Removal of the Isolation Valve Assembly |
| AMM 47-21-41-400-001 | Installation of the Isolation Valve Assembly |
| AMM 47-31-34-740-001 | BITE Test of the IGGS with Bleed Air |
Subtask 47-11-00-740-052-A ** ON A/C NOT FOR ALL 4. Fault Isolation
Subtask 47-11-00-810-051-A ** ON A/C NOT FOR ALL
A. Procedure
(2) Do the test given in para. 3.
(3) if the fault continues:
(a) Do a check and repair the:
Subtask 47-11-00-740-053-A ** ON A/C NOT FOR ALL NOTE: Before the Gate Valve replacement, send to Airbus the TSD CSAS/IGGS, to make sure of the Gate Valve failure.
(1) Replace the ISOL VALVE-CSAS FROM IGGS [3YA] AMM 47-21-41-000-001 and AMM 47-21-41-400-001. (2) Do the test given in para. 3.
(3) if the fault continues:
(a) Do a check and repair the:
wiring from IGGS CLT UNIT (1YA) pin A/7 to GATE VLV (3YA) pin A/1 wiring from IGGS CLT UNIT (1YA) pin A/36 to GATE VLV (3YA) pin A/2 wiring from IGGS CLT UNIT (1YA) pin A/59 to GATE VLV (3YA) pin A/4 wiring from ground to GATE VLV (3YA) pin A/5 ASM 471101.
B. Do the test given in para. 3.
NOTE: After the subsequent flight make sure that the fault does not continue.