Loss of the Power Supply of the Bleed Pressure-Regulator Valve of the Engine 2
TASK 36-11-00-810-854-A
Loss of the Power Supply of the Bleed Pressure-Regulator Valve of the Engine 2
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 36-11-00-710-152-A ** ON A/C NOT FOR ALL
Subtask 36-11-00-865-058-A ** ON A/C NOT FOR ALL
[Rev.8 from Aug 2018]
2026.04.04 04:33:45 UTC
Loss of the Power Supply of the Bleed Pressure-Regulator Valve of the Engine 2
1. Possible Causes
- BMC-2 [1HA2]
wiring between the BMC2 pin AB/1B and the ground terminal wiring between the BMC2 pin AA/8A and the circuit breaker (3HA2) - C/B-AIR BLEED/ENG 2/CTL [3HA2]
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TSM TASK 24-00-00-810-803-A | Circuit Breaker Tripped and/or C/B TRIPPED Warning |
| ASM 361102 | |
| AMM 36-11-34-000-001 | Removal of the BMC |
| AMM 36-11-34-400-001 | Installation of the BMC |
Subtask 36-11-00-710-152-A ** ON A/C NOT FOR ALL
A. Not applicable.
4. Fault IsolationSubtask 36-11-00-865-058-A ** ON A/C NOT FOR ALL
A. Table of the circuit breakers used in this procedure:
Subtask 36-11-00-810-102-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
B. If the fault symptom is identified by the maintenance message CHECK PRESS REG-V PWR SPLY:
Subtask 36-11-00-710-153-A ** ON A/C NOT FOR ALL - Do a check of the status of the circuit breaker (3HA2).
- Do a check for 28VDC at pin AA/8A of the BMC2 (1HA2) ASM 361102.
- Replace the BMC-2 [1HA2] AMM 36-11-34-000-001 and AMM 36-11-34-400-001.
- Do a check for ground at pin AB/1B of the BMC2 (1HA2).
- Repair the
wiring between the BMC2 pin AB/1B and the ground terminal .
- Do a check of the
wiring between the BMC2 pin AA/8A and the circuit breaker (3HA2) .
- Repair the above wiring.
- Replace the circuit breaker (3HA2).
- Do the procedure (Ref. TSM TASK 24-00-00-810-803).
- Replace the C/B-AIR BLEED/ENG 2/CTL [3HA2] .
- Replace the BMC-2 [1HA2] .
C. Do the operational test given in Para. 3.