W DOC AIRBUS | TSM A320F

MMR2 Test cannot be started


TASK 34-36-00-810-853-A
MMR2 Test cannot be started


1. Possible Causes
  • MMR-2 [40RT2]
  • LGCIU-2 [5GA2]
  • wiring between the MMR2(40RT2) and the LGCIU2(5GA2)
  • FMGC-2 [1CA2]
  • wiring between the MMR2(40RT2) and the FMGC2(1CA2)
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
AMM 22-83-34-000-001
Removal of the FMGC
AMM 22-83-34-400-001
Installation of the FMGC
AMM 32-31-71-000-001
Removal of the LGCIU
AMM 32-31-71-400-001
Installation of the LGCIU
AMM 34-36-00-740-003
BITE Test of the MMR
ASM 343601
AMM 34-36-31-000-001
Removal of the ILS Receiver
AMM 34-36-31-400-001
Installation of the ILS Receiver
3. Fault Confirmation
Subtask 34-36-00-740-122-A
A. Test
Do the BITE test of the MMR2 AMM 34-36-00-740-003.
4. Fault Isolation
Subtask 34-36-00-810-117-A
A. If the test gives the maintenance message
LGCIU2(5GA2)/FMGC2(1CA2)/ MMR2(40RT2):
  • do a check for a short to ground at pins AB/4A, 15F of the MMR-2 [40RT2] ASM 343601.
   (1) If there is no short to ground:
   (2) If there is a short to ground at pin AB/4A:
     (a) If there is a short to ground at pin AB/4A:
  • do a check and repair the wiring between the MMR2(40RT2) and the LGCIU2(5GA2) for pin AB/4A and pin AB/8H ASM 343601.
   (3) If there is a short to ground at pin AB/15F:
     (a) If there is a short to ground at pin AB/15F:
  • do a check and repair the wiring between the MMR2(40RT2) and the FMGC2(1CA2) for pin AB/15F and pin AB/9A ASM 343601.
Subtask 34-36-00-740-123-A
B. Do the test given in Para. 3.
[Rev.8 from Aug 2018] 2026.04.04 04:33:01 UTC