Failure of the ADM Power Supply of the ADIRU2


1. Possible Causes
  • ADIRU-2 [1FP2]
  • ADM-R TOTAL PRESSURE [19FP2]
  • ADM-R STATIC PRESSURE [19FP6]
  • ADM-L STATIC PRESSURE [19FP7]
  • aircraft wiring
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
AMM 34-11-17-000-001
Removal of the Air Data Module
AMM 34-11-17-400-001
Installation of the Air Data Module
AMM 34-12-34-000-001
Removal of the ADIRU
AMM 34-12-34-400-001
Installation of the ADIRU
AMM 34-13-00-740-002
INTERFACE TEST of the ADR
ASM 341303
3. Fault Confirmation
Subtask 34-11-00-740-124-A ** ON A/C NOT FOR ALL
A. Test
Do the Interface test of the ADR (system 2) AMM 34-13-00-740-002.
4. Fault Isolation
Subtask 34-11-00-810-196-A ** ON A/C NOT FOR ALL
A. If the test gives the maintenance message ADM2 (19FP2)/ ADM6 (19FP6)/ ADM7 (19FP7):
  • remove the ADIRU-2 [1FP2] AMM 34-12-34-000-001
  • make sure that there is no continuity between pins AA/6G, 6H, between pins AA/6H, 6J and between pins AA/6G, 6J of the rack connector.
   (1) If there is no continuity:
   (2) If there is continuity:
  • get access to the ADM-R TOTAL PRESSURE [19FP2] AMM 34-11-17-000-001 (Para. 2.B.)
  • disconnect the electrical connector of the ADM2 and make sure that there is no continuity between pins A/A, C, between pins A/C, E and between pins A/A, E of the ADM2.
     (a) If there is continuity:
     (b) If there is no continuity:
  • get access to the ADM-R STATIC PRESSURE [19FP6] and the ADM-L STATIC PRESSURE [19FP7] AMM 34-11-17-000-001 (Para. 2.B.)
  • disconnect the electrical connector of the ADM6 and make sure that there is no continuity between pins A/A, C, between pins A/C, E and between pins A/A, E of the ADM6.
       1 If there is continuity:
       2 If there is no continuity:
  • disconnect the electrical connector of the ADM7 and make sure that there is no continuity between pins A/A, C, between pins A/C, E and between pins A/A, E of the ADM7.
         a If there is continuity:
  • replace the ADM7
  • connect the electrical connector of the ADM2 and 6
  • install the ADIRU2.
         b If there is no continuity:
  • do a check and repair the aircraft wiring between ADIRU2 pins AA/6G, 6H, 6J and the related LRU ASM 341303
  • connect the electrical connector of the ADM
  • install the ADIRU2.
Subtask 34-11-00-740-125-A ** ON A/C NOT FOR ALL
B. Do the test given in Para. 3.