Failure of the Forward-Right Lateral Dome-Light in the Avionics Compartment
TASK 33-35-00-810-804-A
Failure of the Forward-Right Lateral Dome-Light in the Avionics Compartment
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 33-35-00-720-056-A 4. Fault Isolation
Subtask 33-35-00-810-053-A
[Rev.8 from Aug 2018]
2026.04.04 04:31:57 UTC
Failure of the Forward-Right Lateral Dome-Light in the Avionics Compartment
1. Possible Causes
P/BSW-AVIONICS COMPT LT (23LS) RELAY-PWR SPLY, AVIONICS COMPT FWD R LT CTL (25LS) - wiring
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 33-35-00-720-001 | Functional Test of the Avionics-Compartment Lighting |
| ASM 333501 | |
| AIPC 333508 |
Subtask 33-35-00-720-056-A 4. Fault Isolation
Subtask 33-35-00-810-053-A
A. If during the functional test when you push the AVIONICS COMPT LT pushbutton-switch (23LS), the forward-right lateral dome-light in the avionics compartment does not operate correctly:
Subtask 33-35-00-720-057-A - remove the
P/BSW-AVIONICS COMPT LT (23LS) AIPC 333508.
- remove the
RELAY-PWR SPLY, AVIONICS COMPT FWD R LT CTL (25LS) AIPC 333508.
- do a check and repair the wiring between the pushbutton switch (23LS) pin A/C2 and the pin A/X1 of the power supply relay (25LS) ASM 333501.
B. Do the test given in Para. 3.