Failure of the First-Officer Supplementary Reading-Light
TASK 33-12-00-810-813-A
Failure of the First-Officer Supplementary Reading-Light
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
3. Fault Confirmation
Subtask 33-12-00-710-074-A
Subtask 33-12-00-810-062-A ** ON A/C NOT FOR ALL
[Rev.8 from Aug 2018]
2026.04.04 04:31:52 UTC
Failure of the First-Officer Supplementary Reading-Light
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 33-12-00-710-001 | Operational Test of the General Illumination |
| ASM 331202 | |
| AIPC 331208 | |
| AMM 33-12-12-000-001 | Removal of the Reading Light |
| AMM 33-12-12-000-803 | Removal of the Supplementary Reading Light and the Single Control Box |
| AMM 33-12-12-400-001 | Installation of the Reading Light |
| AMM 33-12-12-400-803 | Installation of the Supplementary Reading Light and the Single Control Box |
| AMM 33-12-17-000-802 | Removal of the Flood-Light Control Boxes |
| AMM 33-12-17-400-802 | Installation of the Flood-Light Control Boxes |
Subtask 33-12-00-710-074-A
A. Test
(1) Do the operational test of the general illumination AMM 33-12-00-710-001
4. Fault Isolation(1) Do the operational test of the general illumination AMM 33-12-00-710-001
NOTE: Do this test for the F/O supplementary reading-light only.
Subtask 33-12-00-810-062-A ** ON A/C NOT FOR ALL
A. If during the operational test, on the First-Officer side:
(1) The reading light rheostat (30LE) is inoperative on the related supplementary reading light (29LE):
Subtask 33-12-00-810-062-C ** ON A/C NOT FOR ALL (1) The reading light rheostat (30LE) is inoperative on the related supplementary reading light (29LE):
- replace the
RHEOSTAT-READING LT (30LE) on the First-Officer side AIPC 331208.
- remove the LT-READING, SUPPLEMENTARY [29LE] AMM 33-12-12-000-001
- make sure that there is 28VDC at the lamp socket.
- replace the defective lamp AMM 33-12-12-400-001.
- do a check for continuity between pin A/1 and pin A/2 of the reading light rheostat (30LE) on the First-Officer side.
- replace the
RHEOSTAT-READING LT (30LE) on the First-Officer side AIPC 331208.
- do a check for 28VDC at pin A/1 of the reading light rheostat (30LE) ASM 331202.
- do a check and repair the wiring between the reading light rheostat (30LE) pin A/1 and the first terminal block ASM 331202.
- do a check and repair the wiring between the supplementary reading light (29LE):
. and the reading light rheostat (30LE)
. and the ground terminal ASM 331202.
A. If during the operational test, on the F/O side:
(1) On the reading light panel 54VU:
Subtask 33-12-00-710-075-A (1) On the reading light panel 54VU:
- The supplementary reading light (29LE) does not come on when you turn the READING LT potentiometer from the OFF position to the BRT position.
- Do a check for a ground signal at pin 2 of the supplementary reading light (29LE) ASM 331202.
- Repair the wiring between pin 2 of the supplementary reading light (29LE) and the ground.
- Do a check for continuity from the pin 1 of the supplementary reading light (29LE) to the pin A/2 of the reading-light single control-box (51LE) ASM 331202.
- Repair the wiring .
- Do a check for 28VDC at pin 1 of the receptacle of the reading-light single control-box (51LE) ASM 331202.
- Repair the wiring .
- Do a check for a ground signal at pin A/3 of the receptacle of the reading-light single control-box (51LE) ASM 331202.
* If there is no ground signal:
* - Repair the wiring between pin A/3 of the receptacle of the reading-light single control-box (51LE) and the ground terminal.
* If there is ground signal:
* - Replace LT-READING, SUPPLEMENTARY [29LE] AMM 33-12-12-000-803 and AMM 33-12-12-400-803.
** If the fault continues:
** - Replace CTL BOX-SINGLE, READING LT [51LE] AMM 33-12-17-000-802 and AMM 33-12-17-400-802.
B. Do the test given in Para. 3.