Vibrations Felt during Climb because of Incorrect Clearance of the NLG Aft Doors
TASK 32-20-00-810-803-A
Vibrations Felt during Climb because of Incorrect Clearance of the NLG Aft Doors
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
3. Fault Confirmation
Subtask 32-20-00-710-050-A ** ON A/C NOT FOR ALL
Subtask 32-20-00-810-053-B
[Rev.8 from Aug 2018]
2026.04.04 04:31:19 UTC
Vibrations Felt during Climb because of Incorrect Clearance of the NLG Aft Doors
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TSM TASK 05-50-00-810-801-A | Identification of the Cause of In-Flight Airframe Vibrations and/or Noises |
| AMM 32-22-00-220-002 | Check of the Aft Nose-Gears Door Gap |
| AMM 32-22-00-820-001 | Adjustment of the NLG doors |
Subtask 32-20-00-710-050-A ** ON A/C NOT FOR ALL
A. Test
(1) Make sure that the identification of the cause of the vibrations is correct (Ref. TSM TASK 05-50-00-810-801).
4. Fault Isolation(1) Make sure that the identification of the cause of the vibrations is correct (Ref. TSM TASK 05-50-00-810-801).
Subtask 32-20-00-810-053-B
A. If you felt vibrations during climb:
Subtask 32-20-00-710-051-A ** ON A/C NOT FOR ALL - do a check of the NLG door gaps and mismatches AMM 32-22-00-220-002
B. After the subsequent flight, make sure that the fault does not continue.