DFDR Inoperative
TASK 31-33-00-810-801-A
DFDR Inoperative
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 31-33-00-710-050-A 4. Fault Isolation
Subtask 31-33-00-810-050-A ** ON A/C NOT FOR ALL
[Rev.8 from Aug 2018]
2026.04.04 04:40:05 UTC
DFDR Inoperative
1. Possible Causes
- DFDR [1TU]
- wiring
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 31-33-00-710-001 | Operational Test of the Power Interlocks and Status Monitoring |
| AMM 31-33-00-710-007 | Operational Test of the DFDR |
| ASM 313301 | |
| AMM 31-33-55-000-001 | Removal of the Digital Flight Data Recorder (DFDR) |
| AMM 31-33-55-400-002 | Installation of the Digital Flight Data Recorder (DFDR) |
Subtask 31-33-00-710-050-A 4. Fault Isolation
Subtask 31-33-00-810-050-A ** ON A/C NOT FOR ALL
A. If the test gives the maintenance message DFDR:
DFDR (1TU) connector AA/23 and SDAC 1 (1WV1), SDAC 2 (1WV2) connector AA/9K,
DFDR (1TU) connector AA/7 and FDIU (2TU) connector AA/9J,
DFDR (1TU) connector AA/8 and FDIU (2TU) connector AA/9K,
DFDR (1TU) connector AA/9 and FDIU (2TU) connector AA/9E,
DFDR (1TU) connector AA/10 and FDIU (2TU) connector AA/9F.
Subtask 31-33-00-810-050-B ** ON A/C NOT FOR ALL - make sure that the CB 7TU and 4RK are closed,
- make sure that the ground control pushbutton is pushed on,
- do a check for 115 VAC at the DFDR (1TU) connectors AA/1 and AA/2 ASM 313301.
- replace the DFDR [1TU] AMM 31-33-55-000-001 and AMM 31-33-55-400-002.
- replace the relays 6RK, 8RK and 10RK.
NOTE: It is not neccesary to replace all the relays. You can replace only the one which is defect.
(3) If the failure continues and if there is no 115 VAC: - do a check and repair the wiring as necessary ASM 313301, between:
CB 7TU and relay 6RK A/B,
CB 7TU and relay 8RK A/B,
Relay 6RK pin A/4 and DFDR (1TU) connector AA/1,
Relay 6RK pin A/X and relay 10RK pin A/X,
Relay 8RK pin A/3 and relay 6RK pin A/4,
Relay 8RK pin A/Z and relay 10RK pin A/B,
DFDR ground pin AA/6 and ground,
DFDR ground pin AA/21 and ground, - do a check for 28VDC at the relay 6RK, 8RK and 10RK pin A/X and A/Z ASM 313301.
DFDR (1TU) connector AA/23 and SDAC 1 (1WV1), SDAC 2 (1WV2) connector AA/9K,
DFDR (1TU) connector AA/7 and FDIU (2TU) connector AA/9J,
DFDR (1TU) connector AA/8 and FDIU (2TU) connector AA/9K,
DFDR (1TU) connector AA/9 and FDIU (2TU) connector AA/9E,
DFDR (1TU) connector AA/10 and FDIU (2TU) connector AA/9F.
A. If the test gives the maintenance message DFDR:
(a) If necessary, do the operational test of the DFDR AMM 31-33-00-710-007.
DFDR (1TU) connector AA/23 and SDAC 1 (1WV1), SDAC 2 (1WV2) connector AA/9K,
DFDR (1TU) connector AA/7 and FDIMU (10TV) connector AA/12G,
DFDR (1TU) connector AA/8 and FDIMU (10TV) connector AA/12H,
DFDR (1TU) connector AA/9 and FDIMU (10TV) connector AB/12G,
DFDR (1TU) connector AA/10 and FDIMU (10TV) connector AB/12H.
Subtask 31-33-00-710-057-A - make sure that the CB 5TV and 4RK are closed,
- on the 21VU make sure that the RCDR GND CTL switch is on (the blue light indicator is on).
- do a check for 115 VAC at the DFDR (1TU) connectors AA/1 and AA/2 ASM 313301.
(a) If necessary, do the operational test of the DFDR AMM 31-33-00-710-007.
- replace the DFDR [1TU] AMM 31-33-55-000-001 and AMM 31-33-55-400-002.
- replace the relays 6RK, 8RK and 10RK.
NOTE: It is not neccesary to replace all the relays. You can replace only the one which is defect.
(3) If the failure continues and if there is no 115 VAC: - do a check and repair the wiring if necessary ASM 313301, between:
CB 7TU and relay 6RK A/B,
CB 7TU and relay 8RK A/B,
Relay 6RK pin A/4 and DFDR (1TU) connector AA/1,
Relay 6RK pin A/X and relay 10RK pin A/X,
Relay 8RK pin A/3 and relay 6RK pin A/4,
Relay 8RK pin A/Z and relay 10RK pin A/B,
DFDR ground pin AA/6 and ground,
DFDR ground pin AA/21 and ground, - do a check for 28VDC at the relay 6RK, 8RK and 10RK pin A/X and A/Z ASM 313301.
DFDR (1TU) connector AA/23 and SDAC 1 (1WV1), SDAC 2 (1WV2) connector AA/9K,
DFDR (1TU) connector AA/7 and FDIMU (10TV) connector AA/12G,
DFDR (1TU) connector AA/8 and FDIMU (10TV) connector AA/12H,
DFDR (1TU) connector AA/9 and FDIMU (10TV) connector AB/12G,
DFDR (1TU) connector AA/10 and FDIMU (10TV) connector AB/12H.
B. Do the test given in paragraph 3.A. again to check the correct operation
(no maintenance message display).
(no maintenance message display).