W DOC AIRBUS | TSM A320F

Loss of Phase A of the Windshield Power Supply


TASK 30-42-00-810-805-A
Loss of Phase A of the Windshield Power Supply


1. Possible Causes
  • WHC-2 [2DG2]
  • wiring between pin A/G of the WHC 2 and the ground terminal
  • wiring between pin A/A of the WHC 2 and the circuit breaker (1DG2)
  • C/B-ANTI ICE/R/WHSLD [1DG2]
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TSM TASK 24-00-00-810-803-A
Circuit Breaker Tripped and/or C/B TRIPPED Warning
AMM 30-42-00-710-001
Operational Test of the Windshield Anti-Icing and Defogging
ASM 304202
AMM 30-42-34-000-001
Removal of the Window Heat Computer (WHC)
AMM 30-42-34-400-001
Installation of the Window Heat Computer (WHC)
3. Fault Confirmation
Subtask 30-42-00-710-058-A
A. Test
   (1) Do the operational test of the windshield anti-icing and defogging AMM 30-42-00-710-001.
4. Fault Isolation
Subtask 30-42-00-865-053-A
A. Table of the circuit breakers used in this procedure:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
123VUANTI ICE/R/WHSLD1DG2AF03
Subtask 30-42-00-810-054-A
B. If the test gives the maintenance message CHECK WINDSHIELD WHC2 SUPPLY:
  • do a check of the status of the circuit breaker (1DG2).
   (1) If the circuit breaker is closed:
  • do a check for 115VAC at pin A/A of the WHC 2 (2DG2) ASM 304202.
     (a) If there is 115VAC:
     (b) If there is no 115VAC:
  • do a check for a ground signal at pin A/G of the WHC 2 (2DG2).
       1 If there is no ground signal:
  • repair the wiring between pin A/G of the WHC 2 and the ground terminal.
       2 If there is a ground signal:
  • do a check of the wiring between pin A/A of the WHC 2 and the circuit breaker (1DG2).
         a If there is no continuity:
  • repair the above wiring.
         b If there is continuity:
  • Replace the C/B-ANTI ICE/R/WHSLD [1DG2] .
   (2) If the circuit breaker is open:
     (a) If the fault continues:
  • Replace the C/B-ANTI ICE/R/WHSLD [1DG2] .
     (b) If the fault continues:
  • Replace the WHC-2 [2DG2] .
Subtask 30-42-00-710-059-A
C. Do the operational test given in Para. 3.
[Rev.8 from Aug 2018] 2026.04.04 04:29:41 UTC