Loss of the System Pressure of the Green Hydraulic System
TASK 29-11-00-810-805-A
Loss of the System Pressure of the Green Hydraulic System
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
3. Fault Confirmation
Subtask 29-11-00-865-053-A
Subtask 29-11-00-810-056-B
Subtask 29-11-00-860-054-A
[Rev.8 from Aug 2018]
2026.04.04 04:39:52 UTC
Loss of the System Pressure of the Green Hydraulic System
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 24-41-00-861-002 | Energize the Aircraft Electrical Circuits from the External Power |
| AMM 24-41-00-862-002 | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| AMM 29-10-00-863-001 | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| AMM 29-10-00-864-001 | Depressurize the Green Hydraulic System |
| AMM 29-11-14-000-001 | Removal of the HP Manifold of the Green Hydraulic System |
| AMM 29-11-14-400-001 | Installation of the HP Manifold of the Green Hydraulic System |
| AMM 29-11-42-000-001 | Removal of the Green Power Accumulator |
| AMM 29-11-42-400-001 | Installation of the Green Power Accumulator |
| ASM 291901 | |
| AMM 29-23-00-860-001 | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| AMM 29-23-00-860-002 | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| AMM 29-23-00-863-001 | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| AMM 29-23-00-864-001 | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| ASM 293201 | |
| AMM 29-32-12-000-001 | Removal of the System Pressure Switch |
| AMM 29-32-12-400-001 | Installation of the System Pressure Switch |
| ASM 315202 |
Subtask 29-11-00-865-053-A
A. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 29-11-00-860-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/SOL VALVES/G/Y/B/LEAK/TST | 1881GP | N35 |
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
B. Aircraft Maintenance Configuration
(2) Energize the aircraft electrical circuits
AMM 24-41-00-861-002.
(3) On panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch is set to on (OFF light not on).
(4) Pressurize the Green hydraulic system from a ground supply or through the PTU AMM 29-10-00-863-001 or AMM 29-23-00-863-001.
(5) Look for fault indications on the lower ECAM DU.
4. Fault IsolationWARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
(1) Disconnect the isolation coupling of the PTU AMM 29-23-00-860-001. (2) Energize the aircraft electrical circuits
AMM 24-41-00-861-002.
(3) On panel 50VU, make sure that the HYD/LEAK MEASUREMENT VALVES/G pushbutton switch is set to on (OFF light not on).
(4) Pressurize the Green hydraulic system from a ground supply or through the PTU AMM 29-10-00-863-001 or AMM 29-23-00-863-001.
(5) Look for fault indications on the lower ECAM DU.
Subtask 29-11-00-810-056-B
A. Fault Confirmation
Subtask 29-11-00-860-055-A WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE.
(1) If the fault confirmation gives the system name and the flow arrow of the Green hydraulic system in amber (on the lower ECAM DU): - do a check of the system pressure on the lower ECAM DU and on the system accumulator gage (1072GM).
- use the rudder pedals to operate the rudder.
- do a check for continuity between the:
SYSTEM-PRESS-SW [1151GN] connector A/A and the connector A/C (with the hydraulic system pressurized) ASM 293201.
- replace the SYSTEM-PRESS-SW [1151GN] AMM 29-32-12-000-001 and AMM 29-32-12-400-001.
- do a check and repair the wiring between the:
SYSTEM-PRESS-SW [1151GN] connector A/C and FWC-1/ FWC-2 connector AA/06C ASM 293201 and ASM 315202.
- do a check for 28 VDC at the:
SOL VALVE-LEAKAGE MEAS, G (1160GP) connector A/A and the connector A/B ASM 291901.
NOTE: There is usually 0 VDC.
1 If there is 28 VDC: - do a check of the wiring between:
the P/BSW (1882GP) connector C2 and the connector C3 ASM 291901.
- replace the
P/BSW (1882GP) .
- do a check and repair the wiring between the:
P/BSW (1882GP) connector C3 and the CB (1881GP) ASM 291901.
- replace the MANIFOLD,HP [1111GM] AMM 29-11-14-000-001 and AMM 29-11-14-400-001.
- replace the accumulator AMM 29-11-42-000-001 and AMM 29-11-42-400-001
- do a check for external leakage and repair the components as necessary.
B. Do the fault confirmation procedure as given in Para. 3. to make sure that the operation is correct.
5. Close-upSubtask 29-11-00-860-054-A
A. Aircraft Maintenance Configuration
(1) De-pressurize the Green hydraulic system AMM 29-10-00-864-001 or AMM 29-23-00-864-001.
(2) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.
(3) Connect the isolation coupling of the PTU AMM 29-23-00-860-002.
(1) De-pressurize the Green hydraulic system AMM 29-10-00-864-001 or AMM 29-23-00-864-001.
(2) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.
(3) Connect the isolation coupling of the PTU AMM 29-23-00-860-002.