APU Fuel LP Valve operates with one Motor only
TASK 28-29-00-810-802-A
APU Fuel LP Valve operates with one Motor only
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 28-29-00-710-052-A
Subtask 28-29-00-810-053-A
[Rev.8 from Aug 2018]
2026.04.04 04:39:44 UTC
APU Fuel LP Valve operates with one Motor only
1. Possible Causes
- ACTUATOR-APU FUEL LP VALVE [3QF]
- RELAY 4KD
- RELAY 5WF
- RELAY 6WF
- wiring
- RELAY 6QC
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| ASM 282201 | |
| AMM 28-29-00-710-001 | Operational Test of the APU Low Pressure Fuel Valve using each individual Motor in turn |
| ASM 282901 | |
| AMM 28-29-51-000-001 | Removal of the APU Fuel LP Valve Actuator |
| AMM 28-29-51-400-001 | Installation of the APU Fuel LP Valve Actuator |
Subtask 28-29-00-710-052-A
A. Do the operational test of the APU LP fuel-valve using each individual motor in turn AMM 28-29-00-710-001.
4. Fault IsolationSubtask 28-29-00-810-053-A
A. If the test with the circuit breaker 1QF open is not correct:
Subtask 28-29-00-810-054-A - replace the ACTUATOR-APU FUEL LP VALVE [3QF] AMM 28-29-51-000-001 and AMM 28-29-51-400-001.
- do a check of the RELAY 4KD and replace it if necessary.
- do a check of the RELAY 5WF and replace it if necessary.
- do a check of the RELAY 6WF and replace it if necessary.
- do a check and repair the wiring from the:
CB 2QF to the ACTUATOR VALVE 3QF B/B,
RELAY 4KD A/C1 and ACTUATOR VALVE 3QF B/B.
- do a check of the RELAY 6QC and replace it if necessary.
- do a check and repair the wiring from the:
RELAY 5WF A/A1 and ACTUATOR VALVE 3QF B/A,
RELAY 6WF A/A1 and ACTUATOR VALVE 3QF B/A,
ACTUATOR VALVE 3QF B/C and GND ASM 282901 and ASM 282201.
B. If the test with the circuit breaker 2QF open is not correct:
Subtask 28-29-00-710-053-A - replace the ACTUATOR-APU FUEL LP VALVE [3QF] AMM 28-29-51-000-001 and AMM 28-29-51-400-001.
- do a check of the RELAY 4KD and replace it if necessary.
- do a check of the RELAY 5WF and replace it if necessary.
- do a check of the RELAY 6WF and replace it if necessary.
- do a check and repair the wiring from the:
CB 1QF to the ACTUATOR VALVE 3QF A/B,
CB 3QC to the ACTUATOR VALVE 3QF A/B,
RELAY 4KD A/B1 and ACTUATOR VALVE 3QF A/B ASM 282901 and ASM 282201.
- do a check of the RELAY 6QC and replace it if necessary.
- do a check and repair the wiring from the:
RELAY 5WF A/B1 and ACTUATOR VALVE 3QF A/A,
RELAY 6WF A/B1 and ACTUATOR VALVE 3QF A/A,
ACTUATOR VALVE 3QF B/C and GND ASM 282901 and ASM 282201.
C. Do the test given in Para. 3.