Failure of the FCDC2
TASK 27-95-00-810-802-A
Failure of the FCDC2
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 27-95-00-740-084-A 4. Fault Isolation
Subtask 27-95-00-810-067-A
[Rev.8 from Aug 2018]
2026.04.04 04:28:23 UTC
Failure of the FCDC2
1. Possible Causes
- FCDC-2 [3CE2]
- wiring of the 28VDC GND signal
wiring of the +28VDC signal
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| ASM 279207 | |
| AMM 27-95-34-000-001 | Removal of the FCDC |
| AMM 27-95-34-400-001 | Installation of the FCDC |
| AMM 27-96-00-740-001 | BITE Test of the EFCS (Ground Scanning) |
Subtask 27-95-00-740-084-A 4. Fault Isolation
Subtask 27-95-00-810-067-A
A. If the BITE test gives the maintenance message:
FCDC2
(a) Do a check of the wiring of the 28VDC GND signal from the FCDC2 (3CE2) to the ground terminal ASM 279207.
wiring of the +28VDC signal from the FCDC2 (3CE2) to the first terminal block ASM 279207.
Subtask 27-95-00-740-085-A FCDC2
- replace the FCDC-2 [3CE2] AMM 27-95-34-000-001 and AMM 27-95-34-400-001.
(a) Do a check of the wiring of the 28VDC GND signal from the FCDC2 (3CE2) to the ground terminal ASM 279207.
- if there is no continuity repair the above wiring
- if there is continuity see the Para. (b).
B. Do the test given in Para. 3.