Failure of the CAPT Pitch Control (New-Generation Side-Stick Unit)
TASK 27-93-00-810-978-A
Failure of the CAPT Pitch Control (New-Generation Side-Stick Unit)
A. Referenced Information
3. Fault Confirmation
Subtask 27-93-00-700-208-A
Subtask 27-93-00-810-258-A
[Rev.8 from Aug 2018]
2026.04.04 04:39:17 UTC
Failure of the CAPT Pitch Control (New-Generation Side-Stick Unit)
NOTE: This task is applicable only for the new-generation side-stick unit.
1. Possible CausesSSU-CAPT (100CE1)
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 27-92-41-000-802 | Removal of the New-Generation Side-Stick Unit |
| AMM 27-92-41-400-802 | Installation of the New-Generation Side-Stick Unit |
| AMM 27-96-00-710-020 | Operational Test of the Side Stick Assembly (Activation for the BITE Test) |
| AMM 27-96-00-740-001 | BITE Test of the EFCS (Ground Scanning) |
Subtask 27-93-00-700-208-A
A. Test
(1) Do the operational test of the side stick unit (activation for the BITE test) AMM 27-96-00-710-020.
(2) Do the BITE test of the EFCS (Ground Scanning) AMM 27-96-00-740-001.
4. Fault Isolation(1) Do the operational test of the side stick unit (activation for the BITE test) AMM 27-96-00-710-020.
(2) Do the BITE test of the EFCS (Ground Scanning) AMM 27-96-00-740-001.
Subtask 27-93-00-810-258-A
A. If the BITE test gives the maintenance message:
CAPT PITCH CTL SSTU 4CE3
Subtask 27-93-00-700-209-A CAPT PITCH CTL SSTU 4CE3
- replace the
SSU-CAPT (100CE1) , AMM 27-92-41-000-802 and AMM 27-92-41-400-802.
B. Do the operational test and the BITE test given in Para. 3.