Loss of the Signal of the Right Yellow Elevator Servocontrol Servovalve by the ELAC 2
TASK 27-93-00-810-879-A
Loss of the Signal of the Right Yellow Elevator Servocontrol Servovalve by the ELAC 2
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 27-93-00-700-140-A
Subtask 27-93-00-810-125-A
[Rev.8 from Aug 2018]
2026.04.04 04:28:01 UTC
Loss of the Signal of the Right Yellow Elevator Servocontrol Servovalve by the ELAC 2
1. Possible Causes
- servovalve
- ELAC-2 [2CE2]
wiring of the R ELEV SV (ANO 2) signal from the ELAC 2 (2CE2) COM part, pins AB/2J, 2H to the ELAC 2 COM part, pins AA/3H, 3G wiring from the ELAC 2 (2CE2) COM part to the MON part wiring from the ELAC 2 (2CE2) MON part, pins AD/3D, 4D to the first terminal block - wiring of the LVDT SV SPLY signal
wiring of the LVDT POS (ANI 3-2) signal - SERVO CTL-R ELEVATOR, INBD Y [34CE2]
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 27-34-51-000-001 | Removal of the Elevator Servo Control |
| AMM 27-34-51-000-008 | Removal of the Elevator Servo Control Actuator Servo Valve |
| AMM 27-34-51-400-001 | Installation of the Elevator Servo Control |
| AMM 27-34-51-400-003 | Installation of the Elevator Servo Control Actuator Servo Valve |
| ASM 279308 | |
| AMM 27-93-34-000-001 | Removal of the ELAC |
| AMM 27-93-34-400-001 | Installation of the ELAC |
| AMM 27-96-00-710-020 | Operational Test of the Side Stick Assembly (Activation for the BITE Test) |
| AMM 27-96-00-740-001 | BITE Test of the EFCS (Ground Scanning) |
Subtask 27-93-00-700-140-A
A. Test
(1) Do the operational test of the side stick assembly (activation for the BITE test) AMM 27-96-00-710-020.
(2) Do the BITE test of the EFCS (ground scanning) AMM 27-96-00-740-001.
4. Fault Isolation(1) Do the operational test of the side stick assembly (activation for the BITE test) AMM 27-96-00-710-020.
(2) Do the BITE test of the EFCS (ground scanning) AMM 27-96-00-740-001.
Subtask 27-93-00-810-125-A
A. If the test gives the maintenance message:
ELAC2 COM OR WIRING TO R Y ELEV SERVO VLV 34CE2
(a) Do a check of thewiring of the R ELEV SV (ANO 2) signal from the ELAC 2 (2CE2) COM part, pins AB/2J, 2H to the ELAC 2 COM part, pins AA/3H, 3G ASM 279308:
wiring from the ELAC 2 (2CE2) COM part to the MON part from pins AA/3J, 3K to pins AD/3B, 4B ASM 279308:
wiring from the ELAC 2 (2CE2) MON part, pins AD/3D, 4D to the first terminal block ASM 279308.
wiring of the LVDT POS (ANI 3-2) signal , from the ELAC 2 (2CE2) MON part to the servocontrol (34CE2) ASM 279308.
Subtask 27-93-00-700-141-A ELAC2 COM OR WIRING TO R Y ELEV SERVO VLV 34CE2
- Replace the servovalve AMM 27-34-51-000-008 and AMM 27-34-51-400-003.
- Replace the ELAC-2 [2CE2] AMM 27-93-34-000-001 and AMM 27-93-34-400-001.
(a) Do a check of the
- if there is continuity see Para. (b)
- if there is no continuity repair the above wiring.
- if there is continuity see Para. (c)
- if there is no continuity repair the above wiring.
- if there is continuity see Para. (d)
- if there is no continuity repair the above wiring.
- if there is continuity see Para. (e)
- if there is no continuity repair the above wiring.
- if there is continuity see Para. (3)
- if there is no continuity repair the above wiring.
B. Do the tests given in Para. 3.