Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1
TASK 27-93-00-810-823-A
Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 27-93-00-860-058-A Subtask 27-93-00-740-066-A 4. Fault Isolation
Subtask 27-93-00-810-072-B
Subtask 27-93-00-860-059-A
[Rev.8 from Aug 2018]
2026.04.04 04:27:56 UTC
Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1
1. Possible Causes
- ELAC-1 [2CE1]
wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| ASM 279227 | |
| AMM 27-93-34-000-001 | Removal of the ELAC |
| AMM 27-93-34-400-001 | Installation of the ELAC |
| AMM 27-96-00-740-001 | BITE Test of the EFCS (Ground Scanning) |
| AMM 29-10-00-863-001 | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| AMM 29-10-00-864-001 | Depressurize the Green Hydraulic System |
Subtask 27-93-00-860-058-A Subtask 27-93-00-740-066-A 4. Fault Isolation
Subtask 27-93-00-810-072-B
A. If the BITE test gives the maintenance message:
ELAC1 OR WIRING FROM G HYD PRESS SW1
or
ELAC1 OR WIRING FROM G HYD PRESS SW2
Subtask 27-93-00-740-067-A ELAC1 OR WIRING FROM G HYD PRESS SW1
or
ELAC1 OR WIRING FROM G HYD PRESS SW2
- replace the ELAC-1 [2CE1] , AMM 27-93-34-000-001 and AMM 27-93-34-400-001.
- do a check and repair the
wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block , COM or MON part as shown in the maintenance message (the COM part is for the maintenance message ELAC 1 OR WIRING FROM G HYD PRESS SW 1 and the MON part is for the maintenance message ELAC 1 OR WIRING FROM G HYD PRESS SW 2) ASM 279227.
B. Do the test given in Para. 3.
5. Close-upSubtask 27-93-00-860-059-A