Failure of the Yellow Hydraulic Pressure Switch
TASK 27-92-00-810-828-A
Failure of the Yellow Hydraulic Pressure Switch
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 27-92-00-860-064-A Subtask 27-92-00-865-059-A
Subtask 27-92-00-810-077-A
Subtask 27-92-00-860-065-A
[Rev.8 from Aug 2018]
2026.04.04 04:27:54 UTC
Failure of the Yellow Hydraulic Pressure Switch
1. Possible Causes
- SEC-2 [1CE2]
- SEC-3 [1CE3]
- ELAC-1 [2CE1]
- ELAC-2 [2CE2]
- SYSTEM-PRESS-SW [3151GN]
wiring from the pressure switch (3151GN) pins A/A and A/B
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TSM TASK 31-32-00-810-932-A | Failure of the Discrete Links |
| ASM 279227 | |
| AMM 27-93-34-000-001 | Removal of the ELAC |
| AMM 27-93-34-400-001 | Installation of the ELAC |
| AMM 27-94-34-000-001 | Removal of the SEC |
| AMM 27-94-34-400-001 | Installation of the SEC |
| AMM 27-96-00-740-001 | BITE Test of the EFCS (Ground Scanning) |
| AMM 29-10-00-863-002 | Pressurize the Yellow Hydraulic System with a Hydraulic Ground Power-Cart |
| AMM 29-10-00-864-002 | Depressurize the Yellow Hydraulic System |
| AMM 29-32-12-000-003 | Removal of the System Pressure Switch |
| AMM 29-32-12-400-003 | Installation of the System Pressure Switch |
Subtask 27-92-00-860-064-A Subtask 27-92-00-865-059-A
B. Table of the circuit breakers used in this procedure:
Subtask 27-92-00-740-100-A 4. Fault Isolation| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | FLIGHT CONTROLS/FCDC1/SPLY | 20CE1 | B10 |
| 121VU | FLIGHT CONTROLS/FCDC2/SPLY | 20CE2 | Q20 |
Subtask 27-92-00-810-077-A
A. If the BITE test gives the maintenance message:
Y HYD PRESS SW2
(1) If the fault continues:
Subtask 27-92-00-740-101-A Y HYD PRESS SW2
- do the trouble shooting procedure (Ref. TSM TASK 31-32-00-810-932)
. related to the DSI 19 discrete input signal of the SEC 2 and SEC 3,
. related to the DSI 32 discrete input signal of the ELAC 1 MON and ELAC 2 MON ASM 279227. - open and close the circuit breakers 20CE1 and 20CE2.
(1) If the fault continues:
- replace the SEC-2 [1CE2] AMM 27-94-34-000-001 and AMM 27-94-34-400-001.
- replace the SEC-3 [1CE3] AMM 27-94-34-000-001 and AMM 27-94-34-400-001.
- replace the ELAC-1 [2CE1] AMM 27-93-34-000-001 and AMM 27-93-34-400-001.
- replace the ELAC-2 [2CE2] AMM 27-93-34-000-001 and AMM 27-93-34-400-001.
- replace the SYSTEM-PRESS-SW [3151GN] AMM 29-32-12-000-003 and AMM 29-32-12-400-003.
- open and close the circuit breakers 20CE1 and 20CE2.
- do a check and repair the
wiring from the pressure switch (3151GN) pins A/A and A/B to the ground, SEC2, SEC3, ELAC1 and ELAC2 ASM 279227. - open and close the circuit breakers 20CE1 and 20CE2.
B. Do the BITE test given in Para. 3.
5. Close-upSubtask 27-92-00-860-065-A