Loss of the Right Spoiler 2 Position Signal for the SEC 3
TASK 27-60-00-810-820-A
Loss of the Right Spoiler 2 Position Signal for the SEC 3
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 27-60-00-700-072-A
Subtask 27-60-00-810-069-A
[Rev.8 from Aug 2018]
2026.04.04 04:27:43 UTC
Loss of the Right Spoiler 2 Position Signal for the SEC 3
1. Possible Causes
- SEC-3 [1CE3]
wiring of the ANI 2-7 signal from the SEC 3 (1CE3) to the first terminal block
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| ASM 279404 | |
| AMM 27-94-34-000-001 | Removal of the SEC |
| AMM 27-94-34-400-001 | Installation of the SEC |
| AMM 27-96-00-710-020 | Operational Test of the Side Stick Assembly (Activation for the BITE Test) |
| AMM 27-96-00-740-001 | BITE Test of the EFCS (Ground Scanning) |
Subtask 27-60-00-700-072-A
A. Test
(1) Do the operational test of the side stick assembly (activation for BITE test) AMM 27-96-00-710-020.
(2) Do the BITE test of the EFCS (Ground scanning) AMM 27-96-00-740-001.
4. Fault Isolation(1) Do the operational test of the side stick assembly (activation for BITE test) AMM 27-96-00-710-020.
(2) Do the BITE test of the EFCS (Ground scanning) AMM 27-96-00-740-001.
Subtask 27-60-00-810-069-A
A. If the BITE test gives the maintenance message:
SEC 3 COM OR WIRING FROM R SPLR 2 POS XDCR 31CE4
or
SEC 3 MON OR WIRING FROM R SPLR 2 POS XDCR 31CE4
Subtask 27-60-00-700-073-A SEC 3 COM OR WIRING FROM R SPLR 2 POS XDCR 31CE4
or
SEC 3 MON OR WIRING FROM R SPLR 2 POS XDCR 31CE4
- replace the SEC-3 [1CE3] , AMM 27-94-34-000-001 and AMM 27-94-34-400-001.
- do a check and repair the
wiring of the ANI 2-7 signal from the SEC 3 (1CE3) to the first terminal block COM part or MON part as shown in the maintenance message ASM 279404.
B. Do the tests given in Para. 3.