W DOC AIRBUS | TSM A320F

SFCC 1 (2) OR FLP PPU POWER SFCC Generated FLAP PPU Power Fault


TASK 27-51-00-810-812-A
SFCC 1 (2) OR FLP PPU POWER SFCC Generated FLAP PPU Power Fault


1. Possible Causes
  • A/C wiring/interface between SFCC 1 (2) and the PPUs'.
  • SLAT/FLAP CONTR.COMP. [21CV]
  • SLAT/FLAP CONTR.COMP. [22CV]
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
AMM 27-51-00-740-002
BITE Test of the Slat and Flap Control Computers (Flap System)
ASM 275106
ASM 275107
AMM 27-51-34-000-001
Removal of the SFCC
AMM 27-51-34-400-001
Installation of the SFCC
3. Fault Confirmation
Subtask 27-51-00-740-052-A
A. SFCC system exitation power test.
   (1) Do the SYSTEM TEST (BITE) on the SFCC 1 (2) AMM 27-51-00-740-002. The fault data" PPU excitation power short circuit" is displayed. Page block 301 table 7 gives the SFCC test menu selections details.
   (2) Do the fault isolation.
4. Fault Isolation
Subtask 27-51-00-810-061-A
A. Procedure
   (1) Make sure that there is no SFCC to PPU external circuit/interface short circuit fault, before troubleshooting the SFCC 1 (2).
     (a) Do a check of the A/C wiring/interface between SFCC 1 (2) and the PPUs'. ASM 275106 ASM 275107
   (2) If there is a wiring/interface fault, do the repair.
     (a) Do the BITE test of the SFCC 1 (2).
     (b) If the same fault message is shown and there are no circuit/interface faults:
   (3) Swap SFCC 1 and SFCC 2 AMM 27-51-34-000-001 and AMM 27-51-34-400-001.
     (a) Get access to the FLP ON GROUND FAULTS and do a check of the ground log.
     (b) If the fault moves with SFCC 1(2):
       1 Install the serviceable SFCC 1(2) in its initial position.
       2 Replace the unserviceable SLAT/FLAP CONTR.COMP. [21CV] or SLAT/FLAP CONTR.COMP. [22CV] .
     (c) If the fault does not move with SFCC 1(2):
  • Install the SFCCs in their initial positions.
   (4) Do the BITE test of the SFCC 1(2)
(Ref. is given in the Para. Fault Confirmation).
5. Close-up
Subtask 27-51-00-942-061-A
A. Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 27-51-00-860-062-A
B. Put the aircraft back to its initial configuration.
[Rev.8 from Aug 2018] 2026.04.04 04:27:37 UTC