Failure of the DC Emergency Generation
TASK 24-60-00-810-815-A
Failure of the DC Emergency Generation
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 24-60-00-865-060-A
Subtask 24-60-00-810-066-A
Subtask 24-60-00-860-075-A
[Rev.8 from Aug 2018]
2026.04.04 04:26:59 UTC
Failure of the DC Emergency Generation
1. Possible Causes
- CNTOR-ESS TR [3PE]
- wiring
- C/B-ESS TR/CNTOR/CTL [5PE]
- TR-ESS [1PE]
- C/B-ESS TR/SPLY [4PE]
- CNTOR-AC ESS BUS SWITCHING [15XE]
- C/B-AC ESS/BUS/EMER/CNTOR/SPLY [15PC]
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TSM TASK 24-00-00-810-803-A | Circuit Breaker Tripped and/or C/B TRIPPED Warning |
| ASM 242402 | |
| AMM 24-24-55-000-002 | Removal of the AC ESS BUS Contactor |
| AMM 24-24-55-400-002 | Installation of the AC ESS BUS Contactor |
| ASM 243401 | |
| AMM 24-34-51-000-001 | Removal of the Essential Transformer Rectifier |
| AMM 24-34-51-400-001 | Installation of the Essential Transformer Rectifier |
| AMM 24-34-55-000-001 | Removal of the Essential TR Contactor |
| AMM 24-34-55-400-001 | Installation of the Essential TR Contactor |
| ASM 243501 | |
| AMM 24-41-00-861-002 | Energize the Aircraft Electrical Circuits from the External Power |
| AMM 24-41-00-862-002 | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| AMM 31-60-00-860-001 | EIS Start Procedure |
| AMM 31-60-00-860-002 | EIS Stop Procedure |
Subtask 24-60-00-865-060-A
A. Table of the circuit breakers used in this procedure:
Subtask 24-60-00-860-074-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 106VU | AC ESS/BUS/EMER/CNTOR/SPLY | 15PC | C08 |
| 106VU | ESS TR/CNTOR/CTL | 5PE | C02 |
| 106VU | ESS TR/SPLY | 4PE | C01 |
| 123VU | TR1/SPLY | 2PU1 | AB10 |
B. Job Set-up
(1) Aircraft Maintenance Configuration
(a) Energize the aircraft electrical circuits
AMM 24-41-00-861-002
(b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
AMM 31-60-00-860-001.
Subtask 24-60-00-710-077-A (1) Aircraft Maintenance Configuration
(a) Energize the aircraft electrical circuits
AMM 24-41-00-861-002
(b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
AMM 31-60-00-860-001.
C. Test
4. Fault Isolation| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the upper ECAM DU:
|
2.In the AC power center 123VU:
| If, on the lower ECAM DU, on the ELEC page:
|
| | If, on the ELEC page:
|
| | If, on the ELEC page:
|
Subtask 24-60-00-810-066-A
A. If the test confirms the fault:
Subtask 24-60-00-810-067-A - Replace the CNTOR-ESS TR [3PE] AMM 24-34-55-000-001 and AMM 24-34-55-400-001.
- Do a check of the status of the circuit breaker (5PE).
- Do a check and repair the wiring between respectively:
. the 28VDC output of the ESS TR (1PE) and the pin A/F of the contactor (3PE)
. the pins A/G and B/3 of the contactor (3PE)
. the pin B/5 of the contactor (3PE) and the pin B/F of the ESS TR (1PE) ASM 243401
- Do the procedure (Ref. TSM TASK 24-00-00-810-803).
- Replace the C/B-ESS TR/CNTOR/CTL [5PE] .
B. If the test confirms the fault:
Subtask 24-60-00-810-068-B - Replace the TR-ESS [1PE] AMM 24-34-51-000-001 and AMM 24-34-51-400-001.
- Do a check of the status of the circuit breaker (4PE).
- Do a check and repair the wiring between the pins L1, L2, L3 of the AC ESS BUS contactor (15XE) and the pins A/A, A/B, A/C of the ESS TR (1PE) ASM 243401.
- Do the procedure (Ref. TSM TASK 24-00-00-810-803).
- Replace the C/B-ESS TR/SPLY [4PE] .
C. If the test confirms the fault:
Subtask 24-60-00-710-078-A - Replace the CNTOR-AC ESS BUS SWITCHING [15XE] AMM 24-24-55-000-002 and AMM 24-24-55-400-002.
- Do a check of the status of the circuit breaker (15PC).
- Do a check and repair the wiring between respectively:
. the pin K1 of the contactor (15XE) and the pins A/B and B/B of the contactor (3XC)
* through the contactor (4PC) and the relay (17PC)
* through the contactors (5PU1) and (5PU2)
. the pin A/D of the contactor (3XC) and the pin B/K of the contactor (15XE), through the contactors (5PU1, 5PU2, 3PC), the relay (17PC), the contactor (3XC) and through the timer (33XE)
. the pin B/D of the contactor (3XC) and the first branch point
. the pin B/L of the contactor (15XE) and the ground through the timer (33XE) ASM 242402 and ASM 243501.
- Do the procedure (Ref. TSM TASK 24-00-00-810-803).
- Replace the C/B-AC ESS/BUS/EMER/CNTOR/SPLY [15PC] .
D. Do this Test:
5. Close-up| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the upper ECAM DU:
|
2.In the AC power center 123VU:
| On the lower ECAM DU, on the ELEC page:
|
3.In the AC power center 123VU:
|
Subtask 24-60-00-860-075-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
AMM 31-60-00-860-002.
(2) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.
(1) Do the EIS stop procedure
AMM 31-60-00-860-002.
(2) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.