W DOC AIRBUS | TSM A320F

Failure of the Ground Power Unit to Supply the Aircraft Electrical Circuits


TASK 24-41-00-810-833-A
Failure of the Ground Power Unit to Supply the Aircraft Electrical Circuits


1. Possible Causes
  • ground power unit
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
AMM 24-41-00-740-002
Operational Check of the GAPCU via the CFDS
AMM 24-41-00-861-002
Energize the Aircraft Electrical Circuits from the External Power
AMM 24-41-00-862-002
De-energize the Aircraft Electrical Circuits Supplied from the External Power
3. Fault Confirmation
Subtask 24-41-00-710-075-A ** ON A/C NOT FOR ALL
A. If the Ground Power Unit (GPU) is connected to the aircraft electrical circuits while a different source supplies the aircraft electrical circuits (IDG, APU, batteries):
  • Disconnect the GPU from the external power receptacle (20XG).
  • On the ELEC panel 35VU, release, push and release again the ELEC/EXT PWR pushbutton switch (10XG) to do a reset of the GAPCU protection function.
  • Connect the GPU to the external power receptacle.
   (1) If, on the EXT PWR panel 108VU, the EXT PWR/AVAIL caution light (9XG) comes on and if, on the ELEC panel 35VU, the AVAIL legend of the ELEC/EXT PWR pushbutton switch (10XG) comes on:
  • Stop the trouble shooting.
   (2) If, on the EXT PWR panel 108VU, the EXT PWR/AVAIL caution light (9XG) stays off and if, on the ELEC panel 35VU, the AVAIL legend of the ELEC/EXT PWR pushbutton switch (10XG) stays off:
  • Do the trouble shooting given in Para. 4.A.
Subtask 24-41-00-710-076-A ** ON A/C NOT FOR ALL
B. If the Ground Power Unit (GPU) is connected to the aircraft electrical circuits with no other source(s) connected (IDG, APU, batteries):
  • Disconnect the GPU from the external power receptacle (20XG).
  • On the ELEC panel 35VU, push the BAT 1 and BAT 2 pushbutton switches (7PB1 and 7PB2) (on the MCDU menu page, make sure that the CFDS indication comes into view).
  • On the ELEC panel 35VU, release, push and release again the ELEC/EXT PWR pushbutton switch (10XG) to do a reset of the GAPCU protection function.
  • Connect the GPU to the external power receptacle.
   (1) If, on the EXT PWR panel 108VU, the EXT PWR/AVAIL caution light (9XG) comes on and if, on the ELEC panel 35VU, the AVAIL legend of the ELEC/EXT PWR pushbutton switch (10XG) comes on:
  • Stop the trouble shooting.
   (2) If, on the EXT PWR panel 108VU, the EXT PWR/AVAIL caution light (9XG) stays off and if, on the ELEC panel 35VU, the AVAIL legend of the ELEC/EXT PWR pushbutton switch (10XG) stays off:
  • Do the trouble shooting given in Para. 4.A.
4. Fault Isolation
Subtask 24-41-00-810-095-A ** ON A/C NOT FOR ALL
A. If the test confirms the fault:
  • Replace the ground power unit .
   (1) If the fault continues:
     (a) If the BITE test gives fault messages:
  • Do the trouble shooting procedures related to the maintenance messages.
Subtask 24-41-00-860-073-A ** ON A/C NOT FOR ALL
B. Do this procedure to make sure that the system operates correctly.
   (1) Energize the aircraft electrical circuits from the external power AMM 24-41-00-861-002.
   (2) De-energize the aircraft electrical circuits from the external power AMM 24-41-00-862-002.
[Rev.8 from Aug 2018] 2026.04.04 04:26:55 UTC