Failure of the ELEC/BAT2 Pushbutton Switch Circuit
TASK 24-38-00-810-839-A
Failure of the ELEC/BAT2 Pushbutton Switch Circuit
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 24-38-00-860-059-A
Subtask 24-38-00-865-053-A
Subtask 24-38-00-860-060-A
[Rev.8 from Aug 2018]
2026.04.04 04:26:51 UTC
Failure of the ELEC/BAT2 Pushbutton Switch Circuit
1. Possible Causes
- P/BSW-ELEC/BAT 2 [7PB2]
- wiring
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| ESPM 2045110 | |
| ASM 243802 | |
| AWM 243806 | |
| AMM 24-41-00-861-002 | Energize the Aircraft Electrical Circuits from the External Power |
| AMM 24-41-00-862-002 | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| AWM 249106 | |
| AWM 315428 | |
| AMM 31-60-00-860-001 | EIS Start Procedure |
Subtask 24-38-00-860-059-A
A. Job Set-up
(1) Push the ELEC/BAT 2 pushbutton switch (7PB2).
(2) Aircraft Maintenance Configuration
(a) Energize the aircraft electrical circuits
AMM 24-41-00-861-002.
(b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
AMM 31-60-00-860-001.
Subtask 24-38-00-710-116-A (1) Push the ELEC/BAT 2 pushbutton switch (7PB2).
(2) Aircraft Maintenance Configuration
(a) Energize the aircraft electrical circuits
AMM 24-41-00-861-002.
(b) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
AMM 31-60-00-860-001.
B. Test
4. Fault Isolation| ACTION | RESULT |
|---|---|
1.On the ECAM control panel:
| On the upper ECAM DU:
|
2.On the ELEC panel 35VU:
| If on the upper ECAM DU:
|
Subtask 24-38-00-865-053-A
A. Table of the circuit breakers used in this procedure:
Subtask 24-38-00-810-090-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 105VU | ELEC/BAT REF/BCL2 | 9PB2 | F02 |
| 105VU | ELEC/BAT BUS/REF/BCL2 | 8PB2 | J02 |
| 122VU | LIGHTING/TST/BOARD/SPLY | 30LP | X06 |
B. If the test confirms the fault:
Subtask 24-38-00-710-117-A - open the circuit breakers 30LP, 8PB2 and 9PB2
- replace the P/BSW-ELEC/BAT 2 [7PB2] ESPM 2045110
- close the circuit breakers 30LP, 8PB2 and 9PB2.
- do a check of the wiring :
. from the pin A/A3 of the ELEC/BAT 2 pushbutton switch (7PB2) to the DC1 ground ASM 243802, AWM 243806 and AWM 249106
. from the pin A/A2 of the ELEC/BAT 2 pushbutton switch (7PB2) to the pin 11Y of the first terminal block 2407VT ASM 243802 and AWM 243806
. from the pin 11P of the first terminal block 2407VT to the pin 25M of the second terminal block 1862VT ASM 243802 and AWM 315428
. from the pin 25E of the second terminal block 1862VT to the pin AD/7H of the SDAC1 (1WV1) ASM 243802 and AWM 315428
. from the pin 25V of the second terminal block 1862VT to the pin AD/7H of the SDAC2 (1WV2) ASM 243802 and AWM 315428.
- repair the wiring.
C. Do the test given in Para. 3.
5. Close-upSubtask 24-38-00-860-060-A
A. Put the aircraft back to its initial configuration.
(1) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.
(1) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.