W DOC AIRBUS | TSM A320F

Abnormal Power Consumption on the 28VDC HOT BUS (701PP)


TASK 24-38-00-810-834-A
Abnormal Power Consumption on the 28VDC HOT BUS (701PP)


1. Possible Causes
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TSM TASK 24-38-00-810-843-A
Incorrect Discharge of the Battery 1
AMM 24-38-34-000-001
Removal of the Battery Charge Limiter (BCL)
AMM 24-38-34-400-001
Installation of the Battery Charge Limiter (BCL)
AMM 24-38-51-000-001
Removal of the Batteries
AMM 24-38-51-400-001
Installation of the Batteries
AMM 24-41-00-861-002
Energize the Aircraft Electrical Circuits from the External Power
AMM 24-41-00-862-002
De-energize the Aircraft Electrical Circuits Supplied from the External Power
AMM 31-32-00-860-004
Procedure to Get Access to the SYSTEM REPORT/TEST/ELEC Page
3. Fault Confirmation
Subtask 24-38-00-860-050-A
A. Job Set-Up
   (1) Aircraft Maintenance Configuration
     (a) Energize the aircraft electrical circuits
AMM 24-41-00-861-002.
     (b) On the overhead panel, on the ELEC panel 35VU, make sure that the BAT1 pushbutton switch is pushed (the OFF legend is off).
     (c) Adjust the brightness of the MCDU screen.
     (d) On the MCDU, get the SYSTEM REPORT/TEST/ELEC page AMM 31-32-00-860-004.
Subtask 24-38-00-865-050-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
121VUAPU/FIRE/EXTIG/SQUIB/A1WFL38
121VUAPU/FIRE/LP VALVE/STBY3WFM41
121VUAPU/FUEL/LP VALVE/CTL1QFM40
121VUHYDRAULIC/PARK BRK/CTL/STBY71GGN37
121VUADIRS/ADIRU/3/28VDC6FP3N03
121VUCLOCK/STBY/SPLY4FSN02
121VUHYDRAULIC/RAT/SPLY/EXTN/SOL12803GEP33
121VUENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A1WE1Q43
122VUFLIGHT CONTROLS/WTB/FLP/SYS110CVS07
122VUFLIGHT CONTROLS/WTB/SLT/SYS19CVS06
122VUELEC/RFL/SPLY/LOGIC4PRU29
122VUELEC/REFLNG/ON/BAT1PRU28
Subtask 24-38-00-710-108-A
C. Do this test
NOTE: Wait at least 15 minutes and do this BITE test of the BCL1.
ACTION
RESULT
1.On the center pedestal, on the MCDU:
  • push the line key adjacent to the BCL indication.
On the MCDU:
  • the BCL page comes into view.
2.On the MCDU:
  • push the line key adjacent to the TEST indication.
On the MCDU, on the BCL/TEST page:
  • if the TEST OK message comes into view, stop the trouble shooting,
  • if the CHECK HOT BUS 1 POWER CONSUMPTION message comes into view, continue the trouble shooting (refer to the paragraph that follows).
Subtask 24-38-00-860-051-A ** ON A/C NOT FOR ALL
D. Preparation of the Fault Isolation
   (1) Make sure that OFF/NAV/ATT selector switches on the ADIRS CDU are in the OFF position.
   (2) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.
   (3) Release BAT1 and BAT2 pushbutton switches.
   (4) Make sure that the refuel/defuel control panel is closed.
   (5) Make sure that the circuit breakers shown in the figure are closed.
   (6) In the battery power center 105VU, install an ammeter as shown in the figure.
Subtask 24-38-00-860-051-B ** ON A/C NOT FOR ALL
D. Preparation of the Fault Isolation
   (1) Make sure that OFF/NAV/ATT selector switches on the ADIRS MSU panel 41VU are in the OFF position.
   (2) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.
   (3) Release BAT1 and BAT2 pushbutton switches.
   (4) Make sure that the refuel/defuel control panel is closed.
   (5) Make sure that the circuit breakers shown in the figure are closed.
   (6) In the battery power center 105VU, install an ammeter as shown in the figure.
4. Fault Isolation
Subtask 24-38-00-810-085-A
A. If the test gives the maintenance message CHECK HOT BUS 1 POWER CONSUMPTION:
  • read the value of the discharge current in the BAT 1 box on the ELEC page of the lower ECAM display unit.
NOTE: When you read the value of the discharge current, make sure that the BAT1 contactor is open (on the ELEC page of the lower ECAM display unit).
   (1) If the value of the discharge current is more than or equal to 1 ampere:
   (2) If the value of the discharge current is less than 1 ampere:
     (a) If the BITE test gives the maintenance message CHECK HOT BUS 1 POWER CONSUMPTION:
     (b) If the BITE test gives the maintenance message TEST OK:
  • make sure that after the subsequent flight, the maintenance message CHECK HOT BUS 1 POWER COSUMPTION does not appear.
       1 If the maintenance message CHECK HOT BUS 1 POWER CONSUMPTION appear:
Subtask 24-38-00-860-052-A
B. Preparation for the test
   (1) Energize the aircraft electrical circuits
AMM 24-41-00-861-002.
Subtask 24-38-00-710-109-A
C. Do this test to make sure that the system operates correctly
NOTE: Wait at least 15 minutes and do this BITE test of the BCL1.
ACTION
RESULT
On the ELEC panel 35VU:
  • push the BAT 1 pushbutton switch.
On the ELEC panel 35VU:
  • the OFF legend of the BAT 1 pushbutton switch goes off.
1.On the center pedestal, on the MCDU:
  • push the line key adjacent to the BCL indication.
On the MCDU:
  • the BCL page comes into view.
2.On the MCDU:
  • push the line key adjacent to the TEST indication.
On the MCDU, on the BCL/TEST page:
  • the TEST OK message comes into view.
5. Close-up
Subtask 24-38-00-860-053-A
A. Put the aircraft back to its initial configuration.
   (1) On the MCDU, push the line key adjacent to the RETURN indication until the MCDU MENU comes into view.
   (2) Fully decrease the brightness of the MCDU screen (display off).
   (3) De-energize the aircraft electrical circuits
AMM 24-41-00-862-002.
[Rev.8 from Aug 2018] 2026.04.04 04:26:49 UTC