Failure of the Supply from the HOT BUS (702PP)
TASK 24-38-00-810-825-A
Failure of the Supply from the HOT BUS (702PP)
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
3. Fault Confirmation
Subtask 24-38-00-710-090-A 4. Fault Isolation
Subtask 24-38-00-810-074-A
[Rev.8 from Aug 2018]
2026.04.04 04:26:48 UTC
Failure of the Supply from the HOT BUS (702PP)
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 24-38-00-710-001 | Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) |
| ASM 243802 | |
| AMM 24-38-34-000-001 | Removal of the Battery Charge Limiter (BCL) |
| AMM 24-38-34-400-001 | Installation of the Battery Charge Limiter (BCL) |
Subtask 24-38-00-710-090-A 4. Fault Isolation
Subtask 24-38-00-810-074-A
A. If the test gives the maintenance message CHECK HOT BUS 702PP/BCL2 CIRCUIT:
Subtask 24-38-00-710-091-A - do a check of the wiring for open circuit between the circuit breaker BAT REF/BCL2 (9PB2) and the pin A/C of the BCL2 ASM 243802.
- repair it.
- replace the P/BSW-ELEC/BAT 2 [7PB2] .
- replace the BCL-2 [1PB2] AMM 24-38-34-000-001 and AMM 24-38-34-400-001.
B. Do the test given in Para. 3.