Failure of the Electrical Wiring between the BCL 2 and the Bus 3PP
TASK 24-38-00-810-816-A
Failure of the Electrical Wiring between the BCL 2 and the Bus 3PP
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 24-38-00-710-080-A 4. Fault Isolation
Subtask 24-38-00-810-065-A
[Rev.8 from Aug 2018]
2026.04.04 04:26:48 UTC
Failure of the Electrical Wiring between the BCL 2 and the Bus 3PP
1. Possible Causes
P/BSW-ELEC/BAT 2 - aircraft wiring
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 24-38-00-710-001 | Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) |
| ASM 243801 |
Subtask 24-38-00-710-080-A 4. Fault Isolation
Subtask 24-38-00-810-065-A
A. If the test gives the maintenance message CHECK DC BAT BUS 3PP/BCL 2 CIRCUIT:
Subtask 24-38-00-710-081-A - do a check of the status of the circuit breaker 8PB2.
- replace the
P/BSW-ELEC/BAT 2 , ASM 243801.
- do a check and repair the aircraft wiring from the pin A/F of the battery 2 line contactor (6PB2) to the pin A/A of the BCL 2 (1PB2), circuit breakers 7PB2 and 8PB2 included, ASM 243801.
- close it.
B. Do the test given in Para. 3.