Battery 2 Fuse Blown
TASK 24-38-00-810-814-A
Battery 2 Fuse Blown
1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 24-38-00-710-076-A 4. Fault Isolation
Subtask 24-38-00-810-063-B ** ON A/C NOT FOR ALL
[Rev.8 from Aug 2018]
2026.04.04 04:26:48 UTC
Battery 2 Fuse Blown
1. Possible Causes
FUSE-BAT 2 (4PB21) - BAT-2 [2PB2]
- CNTOR-LINE, BAT 2 [6PB2]
- BCL-2 [1PB2]
- wiring
- MODULE-DC BUS 1 CNTOR [13PN]
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 24-38-00-710-001 | Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) |
| AMM 24-38-00-960-801 | Replacement of the DC Fuse 4PB11(4PB21) |
| ASM 243802 | |
| AMM 24-38-34-000-001 | Removal of the Battery Charge Limiter (BCL) |
| AMM 24-38-34-400-001 | Installation of the Battery Charge Limiter (BCL) |
| AMM 24-38-51-280-001 | Removal of the Battery for Overhaul |
| AMM 24-38-55-000-001 | Removal of the Battery Line Contactor |
| AMM 24-38-55-400-001 | Installation of the Battery Line Contactor |
| AMM 24-61-58-000-001 | Removal of the DC Bus 1 Contactor Module |
| AMM 24-61-58-400-001 | Installation of the DC Bus 1 Contactor Module |
Subtask 24-38-00-710-076-A 4. Fault Isolation
Subtask 24-38-00-810-063-B ** ON A/C NOT FOR ALL
A. If the test gives the maintenance message FUSE 4PB2:
Subtask 24-38-00-810-063-C ** ON A/C NOT FOR ALL - Replace
FUSE-BAT 2 (4PB21) AMM 24-38-00-960-801.
- Do the check and the restoration of the BAT-2 [2PB2] AMM 24-38-51-280-001.
- Replace CNTOR-LINE, BAT 2 [6PB2] AMM 24-38-55-000-001 and AMM 24-38-55-400-001.
- Replace BCL-2 [1PB2] AMM 24-38-34-000-001 and AMM 24-38-34-400-001.
- Do a check and repair the wiring between ASM 243802:
* Pin A/L of the BCL2 (1PB2) and the BAT2 shunt (3PB2)
* Pin A/F of the battery 2 line contactor (6PB2) and the 28VDC battery busbar (3PP).
A. If the test gives the maintenance message FUSE 4PB2:
Subtask 24-38-00-710-077-A - Replace
FUSE-BAT 2 (4PB21) AMM 24-38-00-960-801.
- Replace MODULE-DC BUS 1 CNTOR [13PN] AMM 24-61-58-000-001 and AMM 24-61-58-400-001.
- Remove the BAT-2 [2PB2] for overhaul AMM 24-38-51-280-001.
- Replace CNTOR-LINE, BAT 2 [6PB2] AMM 24-38-55-000-001 and AMM 24-38-55-400-001
- Replace BCL-2 [1PB2] AMM 24-38-34-000-001 and AMM 24-38-34-400-001.
- Do a check and repair the wiring between ASM 243802:
* Pin A/L of the BCL2 (1PB2) and the BAT2 shunt (3PB2)
* Pin A/F of the battery 2 line contactor (6PB2) and the 28VDC battery busbar (3PP).
B. Do the test given in Para. 3.