W DOC AIRBUS | TSM A320F

Failure of the Battery 2 Contactor


TASK 24-38-00-810-813-A
Failure of the Battery 2 Contactor


1. Possible Causes
  • CNTOR-LINE, BAT 2 [6PB2]
  • BCL-2 [1PB2]
  • wiring
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
AMM 24-38-00-710-001
Operational Test of the Battery Charge Limiter (BCL), (with the CFDS)
ASM 243802
AMM 24-38-34-000-001
Removal of the Battery Charge Limiter (BCL)
AMM 24-38-34-400-001
Installation of the Battery Charge Limiter (BCL)
AMM 24-38-55-000-001
Removal of the Battery Line Contactor
AMM 24-38-55-400-001
Installation of the Battery Line Contactor
3. Fault Confirmation
Subtask 24-38-00-710-074-A
A. Test
Do the operational test of the BCL 2 AMM 24-38-00-710-001.
4. Fault Isolation
Subtask 24-38-00-810-062-A
A. If the test gives the maintenance message CHECK CONTACTOR 6PB2/BCL 2 CIRCUIT:
   (1) If the fault continues:
     (a) If the fault continues:
  • Do a check of the wiring ASM 243802 between:
    . Pin B/5 of the battery 2 line contactor (6PB2) and pin A/G of the BCL 2 (1PB2).
    . Pin B/3 of the battery 2 line contactor and pin 1 of the circuit breaker ELEC/HOT BUS/702PPSPLY (5PB2).
    . Pin B/15 of the battery 2 line contactor and pin A/i of the BCL 2.
    . Pin B/17 of battery 2 line contactor and the ground.
       1 If the wiring is not correct:
  • Repair the wiring .
       2 If the wiring is correct:
  • Do a check and repair the wiring ASM 243802 between:
    . Pin A/A1 of the battery 2 pushbutton switch (7PB2) and pin A/F of the BCL 2.
    . Pin A/A3 of the battery 2 pushbutton switch and the ground.
Subtask 24-38-00-710-075-A
B. Do the test given in Para. 3.
[Rev.8 from Aug 2018] 2026.04.04 04:26:47 UTC