1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 24-38-00-710-001 | Operational Test of the Battery Charge Limiter (BCL), (with the CFDS) |
| AMM 24-38-34-000-001 | Removal of the Battery Charge Limiter (BCL) |
| AMM 24-38-34-400-001 | Installation of the Battery Charge Limiter (BCL) |
| AMM 24-38-51-000-001 | Removal of the Batteries |
| AMM 24-38-51-400-001 | Installation of the Batteries |
Subtask 24-38-00-710-052-A 4. Fault Isolation
Subtask 24-38-00-810-051-A
A. If the test gives the maintenance message BATTERY 2:
Subtask 24-38-00-710-053-A - replace the BAT-2 [2PB2] , AMM 24-38-51-000-001 and AMM 24-38-51-400-001.
- replace the BCL-2 [1PB2] , AMM 24-38-34-000-001 and AMM 24-38-34-400-001.
B. Do the test given in Para. 3.