1. Possible Causes
A. Referenced Information
3. Fault Confirmation
Subtask 24-24-00-710-058-A
Subtask 24-24-00-865-051-A
[Rev.8 from Aug 2018]
2026.04.04 04:26:42 UTC
Result of the EMER GEN Test Incorrect (Loss of the AC ESS Busbar)
1. Possible Causes
- CNTOR-AC ESS BUS SWITCHING [15XE]
- wiring
- TIMER [33XE]
- C/B-AC ESS BUS/EMER/CNTOR/CTL [5XE]
- C/B-AC ESS/BUS/EMER/CNTOR/SPLY [15PC]
- GLC-EMER [2XE]
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TSM TASK 24-00-00-810-803-A | Circuit Breaker Tripped and/or C/B TRIPPED Warning |
| AMM 24-24-00-710-001 | Operational Test of the Emergency Generation System |
| ASM 242402 | |
| AMM 24-24-55-000-001 | Removal of the Emergency Generator Line Contactor (EMER GLC) |
| AMM 24-24-55-000-002 | Removal of the AC ESS BUS Contactor |
| AMM 24-24-55-400-001 | Installation of the Emergency Generator Line Contactor (EMER GLC) |
| AMM 24-24-55-400-002 | Installation of the AC ESS BUS Contactor |
| ASM 243501 |
Subtask 24-24-00-710-058-A
A. Test
Do the operational test of the emergency generation system AMM 24-24-00-710-001.
(1) If during the test:
on the upper ECAM display unit:
(2) If during the test:
on the upper ECAM display unit:
4. Fault IsolationDo the operational test of the emergency generation system AMM 24-24-00-710-001.
(1) If during the test:
on the upper ECAM display unit:
- the ELEC AC ESS BUS FAULT warning comes into view
- the ESS TR voltage is 28VDC
- the line between the EMER GEN and ESS TR boxes comes on green.
(2) If during the test:
on the upper ECAM display unit:
- the ELEC AC ESS BUS FAULT warning comes into view
- the ESS TR voltage is 0VDC
- the EMER GEN voltage and frequency are correct
- the line between the EMER GEN and ESS TR boxes goes off
- the line between the EMER GEN and the AC ESS bus goes off
Subtask 24-24-00-865-051-A
A. Table of the circuit breakers used in this procedure:
Subtask 24-24-00-810-054-B | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 106VU | AC ESS BUS/EMER/CNTOR/CTL | 5XE | B07 |
| 106VU | AC ESS/BUS/EMER/CNTOR/SPLY | 15PC | C08 |
B. If the test confirms the fault:
Subtask 24-24-00-810-055-A - Do a check of the status of the circuit breakers (5XE) and (15PC).
- Replace the CNTOR-AC ESS BUS SWITCHING [15XE] AMM 24-24-55-000-002 and AMM 24-24-55-400-002.
- Do a check of the wiring between respectively:
. the pins L3 and B/K of the AC ESS BUS SWITCHING contactor (15XE)
. the pin K1 of the contactor (15XE) and the pins A/B then B/B of the AC ESS BUS switching contactor (3XC) through the DC ESS BUS supply contactor (4PC) and the relay (17PC)
. the pin B/D of the contactor (3XC) and the pin A/A3 of the timer (33XE)
. the pin A/D of the contactor (3XC) and the pin A/A3 of the timer (33XE)
. the pin K1 of the contactor (15XE) and the pin A3 of the relay (17PC), through the TR1 and TR2 contactors (5PU1) and (5PU2)
. the pin B/K of the contactor (15XE) and the pin A/C3 of the timer (33XE)
. the pin B/L of the contactor (15XE) and the ground, through the timer (33XE) ASM 242402 and ASM 243501. - If the wiring is correct:
. Replace the TIMER [33XE] .
- Do the procedure (Ref. TSM TASK 24-00-00-810-803).
- Replace the C/B-AC ESS BUS/EMER/CNTOR/CTL [5XE] .
- Do the procedure (Ref. TSM TASK 24-00-00-810-803).
- Replace the C/B-AC ESS/BUS/EMER/CNTOR/SPLY [15PC] .
C. If the test confirms the fault:
Subtask 24-24-00-710-059-A - replace the GLC-EMER [2XE] AMM 24-24-55-000-001 and AMM 24-24-55-400-001.
- do a check and repair the wiring between the pin A/X of the CSM/G control unit (1XE) and the pin X of the EMER GLC (2XE) then between the pin Z of the EMER GLC (2XE) and the ground ASM 242402.