1. Possible Causes
  • P2 FLOW CTL VALVE [8HB]
  • SENSOR-COMPRESSOR TEMPERATURE [32HH]
  • SENSOR-COMPRESSOR OVHT [35HH]
  • RELAY-WHEEL 3 SPEED [24GG]
  • BSCU [10GG]
  • P2 CONTROLLER [27HH]
  • P2 FLOW SENSOR [9HB]
  • FLOW CTL UNIT - PACK 2 [24HB]
  • CONT-AIR COND SYSTEM 2 [57HH]
  • SENSOR-DELTA P, PACK 2 [24HB2]
  • MACHINE-AIR CYCLE [11HM1]
  • SENSOR-PACK OUTLET TEMP [34HH]
  • water injector nozzle
  • HEAT EXCHANGER-MAIN [11HM7]
  • HEAT EXCHANGER-PRIMARY [11HM6]
  • CONDENSER [11HM2]
  • condensor leakage
  • REHEATER [11HM3]
  • PLENUM CHAMBER [11HM5]
  • VALVE-ANTI ICE [37HH]
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
AMM 12-33-21-618-001
Pre-conditioning through the LP Ground Connection
AMM 21-51-11-000-001
Removal of the Differential Pressure Sensor
AMM 21-51-11-400-001
Installation of the Differential Pressure Sensor
AMM 21-51-51-000-001
Removal of the Pack Flow-Control Valve/ Pack Flow-Control Unit
AMM 21-51-51-400-001
Installation of the Pack Flow-Control Valve/ Pack Flow-Control Unit
AMM 21-52-00-100-001
Cleaning of the Air Conditioning Pack-Primary Heat Exchanger and the Main Heat Exchanger
AMM 21-52-00-100-002
Remove Reheater for Cleaning
AMM 21-52-00-100-003
Cleaning of the Air Conditioning Pack-Condenser
AMM 21-52-00-200-001
Detailed Inspection of the Plenum Chamber for Signs of Delamination
AMM 21-52-00-200-003
Detailed Visual Inspection of the Anti-Ice Valve Sense-Lines
AMM 21-52-00-780-001
Pressure Drop Test of the Reheater
AMM 21-52-00-790-001
Remove Condenser for Leak Test
AMM 21-52-00-960-001
Replacement of the Water Injector Nozzle
AMM 21-52-21-000-001
Removal of the Air Cycle Machine
AMM 21-52-21-400-001
Installation of the Air Cycle Machine
AMM 21-52-22-000-001
Removal of the Fan Plenum Chamber
AMM 21-52-22-400-001
Installation of the Fan Plenum Chamber
AMM 21-61-00-710-001
Operational Test of the Pack Temperature-Control System
ASM 216101
ASM 216102
AMM 21-61-11-000-001
Removal of the Compressor Outlet - Temperature Sensor
AMM 21-61-11-400-001
Installation of the Compressor Outlet - Temperature Sensor
AMM 21-61-12-000-001
Removal of the Compressor Overheat - Temperature Sensor
AMM 21-61-12-400-001
Installation of the Compressor Overheat - Temperature Sensor
AMM 21-61-15-000-001
Removal of the Pack Outlet - Temperature Sensors
AMM 21-61-15-400-001
Installation of the Pack Outlet - Temperature Sensors
AMM 21-61-34-000-001
Removal of the Pack Controller
AMM 21-61-34-000-002
Removal of the Air-Conditioning System Controller
AMM 21-61-34-400-001
Installation of the Pack Controller
AMM 21-61-34-400-002
Installation of the Air-Conditioning System Controller
AMM 21-61-41-000-001
Removal of the Anti-Ice Valve
AMM 21-61-41-400-001
Installation of the Anti-Ice Valve
AMM 32-42-34-400-001
Installation of the Braking/Steering Control Unit (BSCU)
3. Fault Confirmation
Subtask 21-61-00-710-152-A
A. APU Bleed-Air Pressure Check
   (1) Do the pre-conditioning with the APU AMM 12-33-21-618-001.
   (2) Make sure that the APU bleed-air pressure is higher than 12 psi (0.8274 bar).
   (3) Stop the pre-conditioning with the APU AMM 12-33-21-618-001.
   (4) If the APU bleed-air pressure is lower than or equal to 12 psi (0.8274 bar), do the trouble shooting of the APU (refer to the fault symptom list / 49-OBSV, APU BLEED FAULT No, Low or Fluctuating APU Bleed-Air Pressure) before you continue with the subsequent procedure.
Subtask 21-61-00-710-052-A ** ON A/C NOT FOR ALL
B. Test
   (1) Do the operational test of the pack temperature-control system AMM 21-61-00-710-001.
NOTE: If a fault is detected, the PC gives a fault code for shop maintenance in addition to the related CFDS message(s) (refer to TSM chapter 21-63-00, page block 301).
   (2) Do the pre-conditioning through the HP ground connection AMM 12-33-21-618-001.
   (3) Do a check that the pack 2 inlet-pressure indication on the ECAM BLEED page is > 20 PSI.
   (4) Do a check of the pack 2 flow indicator, the compressor discharge and pack outlet temperature on the ECAM BLEED page.
   (5) Do a check to see that there is airflow at the pack 2 ram-air outlet.
Subtask 21-61-00-710-052-B ** ON A/C NOT FOR ALL
B. Test
   (1) Do the operational test of the pack temperature-control system AMM 21-61-00-710-001.
   (2) Do the pre-conditioning through the HP ground connection AMM 12-33-21-618-001.
   (3) Do a check that the pack 2 inlet-pressure indication on the ECAM BLEED page is > 20 PSI.
   (4) Do a check of the pack 2 flow indicator, the compressor discharge and pack outlet temperature on the ECAM BLEED page.
   (5) Do a check to see that there is airflow at the pack 2 ram-air outlet.
4. Fault Isolation
Subtask 21-61-00-810-063-A
A. If the pack 2 inlet-pressure indication on the ECAM BLEED page is < 20 PSI:
  • increase the pressure to > 25 PSI.
Subtask 21-61-00-810-064-A ** ON A/C NOT FOR ALL
B. For a Compressor Discharge Overheat Condition:
   (1) If you select on the panel 30VU low airflow and the pack 2 flow indicator on the ECAM BLEED page moves to the HI indication:
   (2) If the fault continues:
  • do a check that the resistance of the compressor temperature sensor (32HH) measured between connector A/A and A/B is in these limits ASM 216102:
Temp (Deg.C)
OHMS
+ 10
103.9 +/- 0.5
+ 20
107.8 +/- 0.5
+ 30
111.7 +/- 0.5
+ 50
119.4 +/- 0.5
+ 70
127.1 +/- 0.5
+ 100
138.5 +/- 0.5
     (a) If the resistance values are out of the specified limits:
   (3) If the fault continues:
  • do a check that the resistance of the compressor overheat sensor (35HH) measured between connector A/A and A/B is in these limits ASM 216102:
Temp (Deg.C)
OHMS
+ 10
103.9 +/- 0.5
+ 20
107.8 +/- 0.5
+ 30
111.7 +/- 0.5
+ 50
119.4 +/- 0.5
+ 70
127.1 +/- 0.5
+ 100
138.5 +/- 0.5
     (a) If the resistance values are out of the specified limits:
   (4) If the fault continues:
  • do a check that the pack 2 ram-air inlet-flap is in the open position.
   (5) If the pack 2 ram-air inlet-flap is closed:
  • do a check for a ground signal at the pack controller 2 (27HH) connector AA/10A ASM 216101.
     (a) If there is a ground signal:
  • do a check of the RELAY-WHEEL 3 SPEED [24GG] and replace it if necessary ASM 216101.
     (b) If the fault continues:
       1 If the test gives a different maintenance message, refer to the Fault Symptom List.
     (c) If the fault continues:
   (6) If the fault continues:
Subtask 21-61-00-810-053-A ** ON A/C NOT FOR ALL
C. For a Pack Outlet Overheat Condition
   (1) If there is no airflow at the pack 2 ram-air outlet:
   (2) If the fault continues:
  • do a check that the resistance of the pack outlet temperature sensor (34HH) measured between connector A/A and A/B is in these limits ASM 216102:
Temp (Deg.C)
OHMS
+ 10
103.9 +/- 0.5
+ 20
107.8 +/- 0.5
+ 30
111.7 +/- 0.5
+ 50
119.4 +/- 0.5
+ 70
127.1 +/- 0.5
+ 100
138.5 +/- 0.5
     (a) If the resistance values are out of the specified limits:
   (3) If the fault continues:
     (a) Remove the inspection panel from the pack 2 ram-air inlet plenum (11HM14),
     (b) Do a check of the water injector nozzle for damage or wear:
     (c) Do a check of the main heat exchanger (11HM7) for contamination:
  • if the main heat exchanger is clogged do the cleaning of the HEAT EXCHANGER-MAIN [11HM7] and the HEAT EXCHANGER-PRIMARY [11HM6] AMM 21-52-00-100-001.
     (d) Install the inspection panel in the pack 2 ram-air inlet plenum (11HM14).
   (4) If the fault continues:
   (5) If the fault continues:
NOTE: This sub-paragraph (4) is only applicable to reheaters with the P/N 755A0000-04 and previous.
It is not applicable to reheaters with the P/N's 755A0000-04 Amendment A or subsequent.
     (a) If the reheater is clogged:
   (6) If the fault continues:
   (7) If the fault continues:
     (a) Do a visual inspection of the plenum chamber of the air cycle machine AMM 21-52-00-200-001.
     (b) If the plenum chamber is damaged:
   (8) If the fault continues:
   (9) If the fault continues:
     (a) Replace the VALVE-ANTI ICE [37HH] AMM 21-61-41-000-001 and AMM 21-61-41-400-001.
   (10) If the fault continues:
  • do a leakage check of the anti-ice valve sense-lines AMM 21-52-00-200-003, and remove if necessary.
Subtask 21-61-00-810-064-B ** ON A/C NOT FOR ALL
D. For a Compressor Discharge Overheat Condition:
   (1) If you select on the panel 30VU NORM airflow and the pack 2 flow indicator on the ECAM BLEED page moves to the HI indication:
   (2) If the fault continues:
  • do a check that the resistance of the compressor discharge sensor (32HH) measured between connector A/B and A/C and connector A/E and A/F is in these limits ASM 216102:
Temp (Deg.C)
OHMS
+ 10
103.9 +/- 0.5
+ 20
107.8 +/- 0.5
+ 30
111.7 +/- 0.5
+ 50
119.4 +/- 0.5
+ 70
127.1 +/- 0.5
+ 100
138.5 +/- 0.5
     (a) If the resistance values are out of the specified limits:
   (3) If the fault continues:
  • do a check that the pack 2 ram-air inlet-flap is in the open position.
   (4) If the pack 2 ram-air inlet-flap is closed:
  • do a check for a ground signal at the ACSC2 (57HH) connector AB/2C ASM 216101.
     (a) If there is a ground signal:
  • do a check of the RELAY-WHEEL 3 SPEED [24GG] and replace it if necessary ASM 216101.
     (b) If the fault continues:
       1 If the test gives a different maintenance message, refer to the Fault Symptom List.
     (c) If the fault continues:
   (5) If the fault continues:
Subtask 21-61-00-810-053-C ** ON A/C NOT FOR ALL
E. For a Pack Outlet Overheat Condition
   (1) If there is no airflow at the pack 2 ram-air outlet:
   (2) If the fault continues:
  • do a check that the resistance of the pack discharge sensor (34HH) measured between connector A/C and A/D and connector A/E and A/F is in these limits ASM 216102:
Temp (Deg.C)
OHMS
+ 10
18820 +/- 5 %
+ 18
13340 +/- 5 %
+ 25
10000 +/- 5 %
+ 30
8197 +/- 5 %
+ 40
5598 +/- 5 %
+ 50
3903 +/- 5 %
     (a) If the resistance values are out of the specified limits:
   (3) If the fault continues:
     (a) Remove the inspection panel from the pack 2 ram-air inlet plenum (11HM14).
     (b) Do a check of the water injector nozzle for damage or wear:
     (c) Do a check of the main heat exchanger (11HM7) for contamination:
  • if the main heat exchanger is clogged do the cleaning of the HEAT EXCHANGER-MAIN [11HM7] and the HEAT EXCHANGER-PRIMARY [11HM6] AMM 21-52-00-100-001.
  • Install the inspection panel on the pack 2 ram-air inlet plenum (11HM14).
   (4) If the fault continues:
   (5) If the fault continues:
NOTE: This sub-paragraph (4) is only applicable to reheaters with the P/N 755A0000-04 and previous.
It is not applicable to reheaters with the P/N's 755A0000-04 Amendment A or subsequent.
     (a) If the reheater is clogged:
   (6) If the fault continues:
   (7) If the fault continues:
Subtask 21-61-00-710-053-A
F. Do the test as given in the Para. 3.A.
5. Close-up
Subtask 21-61-00-860-051-A
A. Put the aircraft back to its initial configuration.
[Rev.8 from Aug 2018] 2026.04.04 04:38:53 UTC