FCV opens during engine start
TASK 21-51-00-810-819-A
FCV opens during engine start
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
3. Fault Confirmation
Subtask 21-51-00-860-078-A
Subtask 21-51-00-810-093-C ** ON A/C NOT FOR ALL
Subtask 21-51-00-860-079-A
[Rev.8 from Aug 2018]
2026.04.04 04:24:48 UTC
FCV opens during engine start
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| ASM 215101 | |
| ASM 215102 | |
| AMM 31-60-00-860-001 | EIS Start Procedure |
| AMM 31-60-00-860-002 | EIS Stop Procedure |
| AMM 71-00-00-710-003 | Engine Automatic Start |
| AMM 71-00-00-710-028 | Engine Shutdown |
Subtask 21-51-00-860-078-A
A. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
AMM 31-60-00-860-001.
(2) Make sure that:
Subtask 21-51-00-710-080-A 4. Fault Isolation(1) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only)
AMM 31-60-00-860-001.
(2) Make sure that:
- on the ECAM lower display unit the BLEED page shows,
- on the AIR COND panel 30VU make sure that the PACK 1 and the PACK 2 pushbutton switches are in the ON position (the FAULT and the OFF legends are off).
Subtask 21-51-00-810-093-C ** ON A/C NOT FOR ALL
A. If 30 sec after engine start on the BLEED page a flow control valve opens:
Subtask 21-51-00-810-093-E ** ON A/C NOT FOR ALL - stop the engines AMM 71-00-00-710-028,
- do a check and repair the wiring ASM 215101 between
- the EIU1 (1KS1) and ACSC1 (47HH),
- the EIU1 (1KS1) and ACSC2 (57HH),
- replace the EIU-1 [1KS1] .
- do a check and repair the wiring ASM 215101 between
- the EIU2 (1KS2) and ACSC1 (47HH),
- the EIU2 (1KS2) and ACSC2 (57HH),
- replace the EIU-2 [1KS2] .
A. If 30 sec after engine start on the BLEED page a flow control valve opens:
Subtask 21-51-00-720-054-A - stop the engines AMM 71-00-00-710-028,
- replace the RELAY 7HV .
- do a check and repair the wiring ASM 215102 between
- the RELAY (7HV) and RELAY (16HB),
- the RELAY (7HV) and RELAY (17HB),
- the RELAY (7HV) and BMC1 (1HA1).
B. Do the test as given in the Para. 3.A.
5. Close-upSubtask 21-51-00-860-079-A
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure
AMM 31-60-00-860-002.
(2) De-energize the aircraft electrical circuits
(1) Do the EIS stop procedure
AMM 31-60-00-860-002.
(2) De-energize the aircraft electrical circuits