Closure of the Avionics Skin Air Inlet and Outlet Valves after Failure of the Cabin Pressure Controller on Ground
TASK 21-26-00-810-831-A
Closure of the Avionics Skin Air Inlet and Outlet Valves after Failure of the Cabin Pressure Controller on Ground
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
3. Fault Confirmation
Subtask 21-26-00-710-102-A
Subtask 21-26-00-810-084-A
[Rev.8 from Aug 2018]
2026.04.04 04:24:38 UTC
Closure of the Avionics Skin Air Inlet and Outlet Valves after Failure of the Cabin Pressure Controller on Ground
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 21-26-00-710-001 | Operational Check of the Avionics Equipment Ventilation-System via MCDU |
| AMM 21-31-34-000-001 | Removal of the Cabin Pressure Controller |
| AMM 21-31-34-400-001 | Installation of the Cabin Pressure Controller |
Subtask 21-26-00-710-102-A
A. Test
(1) Do an operational test of the avionics equipmemt ventilation from the Multipurpose Control and Display Unit (MCDU) AMM 21-26-00-710-001.
(a) Make sure that the avionics equipment ventilation system operates correctly.
(b) Make sure that the skin air inlet and outlet valves (15HQ and 22HQ) stay closed.
4. Fault Isolation(1) Do an operational test of the avionics equipmemt ventilation from the Multipurpose Control and Display Unit (MCDU) AMM 21-26-00-710-001.
(a) Make sure that the avionics equipment ventilation system operates correctly.
(b) Make sure that the skin air inlet and outlet valves (15HQ and 22HQ) stay closed.
Subtask 21-26-00-810-084-A
A. If the test confirms the fault:
(1) Remove the two cabin pressure controllers (11HL and 12HL) AMM 21-31-34-000-001.
(2) Make sure that the skin air inlet and outlet valves (15HQ and 22HQ) open.
(3) Install the cabin pressure controller 1 (11HL) AMM 21-31-34-400-001.
(a) If the skin air inlet and outlet valves close:
1 Replace the PRESS CONT 1 [11HL] AMM 21-31-34-000-001 and AMM 21-31-34-400-001.
2 Install the cabin pressure controller 2 (12HL) AMM 21-31-34-400-001.
(b) If the skin air inlet and outlet valves stay open:
1 Install the cabin pressure controller 2 (12HL) AMM 21-31-34-400-001.
2 Make sure that the skin air inlet and outlet valves close.
3 Replace the PRESS CONT 2 [12HL] AMM 21-31-34-000-001 and AMM 21-31-34-400-001.
Subtask 21-26-00-710-103-A (1) Remove the two cabin pressure controllers (11HL and 12HL) AMM 21-31-34-000-001.
(2) Make sure that the skin air inlet and outlet valves (15HQ and 22HQ) open.
(3) Install the cabin pressure controller 1 (11HL) AMM 21-31-34-400-001.
(a) If the skin air inlet and outlet valves close:
1 Replace the PRESS CONT 1 [11HL] AMM 21-31-34-000-001 and AMM 21-31-34-400-001.
2 Install the cabin pressure controller 2 (12HL) AMM 21-31-34-400-001.
(b) If the skin air inlet and outlet valves stay open:
1 Install the cabin pressure controller 2 (12HL) AMM 21-31-34-400-001.
2 Make sure that the skin air inlet and outlet valves close.
3 Replace the PRESS CONT 2 [12HL] AMM 21-31-34-000-001 and AMM 21-31-34-400-001.
B. Do the operational test given in Para. 3.