Hard/Overweight Landing
TASK 05-50-00-810-802-A
Hard/Overweight Landing
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
3. Fault Confirmation
Subtask 05-50-00-710-051-A
Subtask 05-50-00-810-051-B
[Rev.8 from Aug 2018]
2026.04.04 04:24:33 UTC
Hard/Overweight Landing
1. Possible Causes
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| AMM 05-51-11-200-004 | Inspections After a Hard Landing or a Hard Overweight Landing for Aircraft without Enhanced DMU/FDIMU Load Report 15 |
Subtask 05-50-00-710-051-A
A. Not Applicable
4. Fault IsolationSubtask 05-50-00-810-051-B
A. After a hard/overweight landing:
(1) Do the procedure: Inspection after Hard/Overweight Landing AMM 05-51-11-200-004.
(1) Do the procedure: Inspection after Hard/Overweight Landing AMM 05-51-11-200-004.