FIN: (5776HM) HOOD-SMOKE
Zone: 212
AMM TASK
- DISTRIBUTION
-
21-20-00-010-001-A
Removal of the Air-Conditioning Distribution Ducts -
21-20-00-410-001-A
Installation of the Air-Conditioning Distribution Ducts -
21-20-00-210-001-A
General Visual Inspection of the Riser Ducts in the Passenger Compartment -
21-20-00-210-002-A
General Visual Inspection of Lavatory and Galley Ventilation Ducting (Zones 220 to 260)
-
21-20-00-010-001-A
IPC FIGURE
- FIGURES
- 35-31-51-03-001 PBE-PROTECTIVE BREATHING EQUIPMENT,CHEMICAL OXYGEN
- 35-31-51-03-001A PBE-PROTECTIVE BREATHING EQUIPMENT,CHEMICAL OXYGEN
- 35-31-51-03-001F PBE-PROTECTIVE BREATHING EQUIPMENT,CHEMICAL OXYGEN
- 35-31-51-03A-001G PBE-PROTECTIVE BREATHING EQUIPMENT
- 35-31-81-01-010B EQUIPMENT INSTL-PORTABLE OXYGEN
- 35-31-81-01-010D EQUIPMENT INSTL-PORTABLE OXYGEN