General Visual Inspection of Lavatory and Galley Ventilation Ducting (Zones 220 to 260)
TASK 21-20-00-210-002-A
General Visual Inspection of Lavatory and Galley Ventilation Ducting (Zones 220 to 260)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 21-20-00-010-053-A
Subtask 21-20-00-210-051-A
Subtask 21-20-00-410-054-A
[Rev.10 from 2021]
2026.04.02 06:10:53 UTC
General Visual Inspection of Lavatory and Galley Ventilation Ducting (Zones 220 to 260)
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 220 | FWD CAB UTILITY AREAS |
| 260 | AFT CABIN UTILITY AREA |
| 251AX, 251BX, 251CX |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 21-20-00-010-001-A | Removal of the Air-Conditioning Distribution Ducts |
| TASK 21-20-00-410-001-A | Installation of the Air-Conditioning Distribution Ducts |
| TASK 21-23-00-720-001-A | Functional Test of the Galley/Lavatory Air Extraction Duct |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-43-000-001-A | Removal of the Upper Sidewall Panel |
| TASK 25-23-43-400-001-A | Installation of the Upper Sidewall Panel |
| TASK 25-23-44-000-001-A | Removal of the Lower Sidewall Panels (Dado Panels) |
| TASK 25-23-44-400-001-A | Installation of the Lower Sidewall Panels (Dado Panels) |
| TASK 25-23-48-000-001-A | Removal of the Cove Light Panel |
| TASK 25-23-48-400-001-A | Installation of the Cove Light Panel |
Subtask 21-20-00-010-053-A
A. Get Access
(1) Remove the cabin ceiling panels between frames C16 and C65 (Ref. AMM TASK 25-23-41-000-001).
Subtask 21-20-00-010-052-A ** ON A/C NOT FOR ALL (1) Remove the cabin ceiling panels between frames C16 and C65 (Ref. AMM TASK 25-23-41-000-001).
B. Get Access
(1) Remove, if installed, the aft lavatory/ies (refer to AMM chapter 25-43).
Subtask 21-20-00-010-052-B ** ON A/C NOT FOR ALL (1) Remove, if installed, the aft lavatory/ies (refer to AMM chapter 25-43).
B. Get Access
(1) Remove, when installed, the aft lavatory (refer to AMM chapter 25-43).
Subtask 21-20-00-010-054-A (1) Remove, when installed, the aft lavatory (refer to AMM chapter 25-43).
C. Get Access
(1) Remove,
(a) the lower sidewall panel 251AX between frames C63 and C65 (Ref. AMM TASK 25-23-44-000-001),
(b) the upper sidewall panel 251BX between frames C63 and C65 (Ref. AMM TASK 25-23-43-000-001) and,
(c) the cove light panel 251CX between frames C63 and C65 (Ref. AMM TASK 25-23-48-000-001).
Subtask 21-20-00-865-054-A (1) Remove,
(a) the lower sidewall panel 251AX between frames C63 and C65 (Ref. AMM TASK 25-23-44-000-001),
(b) the upper sidewall panel 251BX between frames C63 and C65 (Ref. AMM TASK 25-23-43-000-001) and,
(c) the cove light panel 251CX between frames C63 and C65 (Ref. AMM TASK 25-23-48-000-001).
D. Open, safety and tag this(these) circuit breaker(s):
Subtask 21-20-00-860-054-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | AIR COND/RECIRC FAN/R/SPLY | 3HG | W18 |
| 122VU | AIR COND/RECIRC FAN/L/SPLY | 1HG | X18 |
E. Safety Precautions
(1) On the panel 30VU:
(a) Make sure that:
(2) On the HP and the LP ground connector put a warning notice in position to tell persons not to supply the ground air.
4. Procedure(1) On the panel 30VU:
(a) Make sure that:
- the APU BLEED pushbutton switch is in the off position (the ON legend is off) and,
- the ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
(2) On the HP and the LP ground connector put a warning notice in position to tell persons not to supply the ground air.
Subtask 21-20-00-210-051-A
A. Inspection
(1) Do a general visual inspection of the of the ventilation ducts for:
(Ref. AMM TASK 21-20-00-010-001) and,
(Ref. AMM TASK 21-20-00-410-001)
5. Close-up(1) Do a general visual inspection of the of the ventilation ducts for:
- breakages, cracks and delamination of the composite material,
- security of installation of the duct system and,
- correct installation and general condition of the duct connections.
- on unused connection points make sure that the blanking caps are in a good condition and are secure.
(Ref. AMM TASK 21-20-00-010-001) and,
(Ref. AMM TASK 21-20-00-410-001)
NOTE: If you replace any compoments in the system you must do the functional test of the galley/lavatory air extraction duct (Ref. AMM TASK 21-23-00-720-001).
Subtask 21-20-00-410-054-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install,
(a) the lower sidewall panel 251AX between frames C63 and C65 (Ref. AMM TASK 25-23-44-400-001),
(b) the upper sidewall panel 251BX between frames C63 and C65 (Ref. AMM TASK 25-23-43-400-001) and,
(c) the cove light panel 251CX between frames C63 and C65 (Ref. AMM TASK 25-23-48-400-001).
Subtask 21-20-00-410-052-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install,
(a) the lower sidewall panel 251AX between frames C63 and C65 (Ref. AMM TASK 25-23-44-400-001),
(b) the upper sidewall panel 251BX between frames C63 and C65 (Ref. AMM TASK 25-23-43-400-001) and,
(c) the cove light panel 251CX between frames C63 and C65 (Ref. AMM TASK 25-23-48-400-001).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install, if removed, the aft lavatory/ies (refer to AMM chapter 25-43).
Subtask 21-20-00-410-052-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install, if removed, the aft lavatory/ies (refer to AMM chapter 25-43).
B. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install, if removed, the aft lavatory (refer to AMM chapter 25-43).
Subtask 21-20-00-410-053-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install, if removed, the aft lavatory (refer to AMM chapter 25-43).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the cabin ceiling panels between C16 and C65 (Ref. AMM TASK 25-23-41-400-001).
Subtask 21-20-00-941-052-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the cabin ceiling panels between C16 and C65 (Ref. AMM TASK 25-23-41-400-001).
D. Remove the WARNING NOTICE(S).
Ventilation Ducting - Component Location