W DOC AIRBUS | AMM A320F

Installation of the Visual Indicator [CFMB]


TASK 79-21-30-400-001-A
Installation of the Visual Indicator


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 110 and 95 lbf.in (1.24 and 1.07 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.CP2101)
graphite grease
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
TASK 71-13-00-410-040-B
Closing of the Fan Cowl Doors
3. Job Set-up
Subtask 79-21-30-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (2) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 79-21-30-010-053-A ** ON A/C NOT FOR ALL
B. Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
   (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
4. Procedure
Subtask 79-21-30-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Visual Indicator

PRE SB CFM 79-0014


END OF PRE SB CFM 79-0014


POST SB CFM 79-0014 or POST SB CFM 79-0023 or POST SB CFM 79-0036


END OF POST SB CFM 79-0014 or POST SB CFM 79-0023 or POST SB CFM 79-0036

   (1) Lubricate the threads of two bolts (40) with graphite grease (Material No.CP2101) .
   (2) Attach the visual indicator (60) to the bracket (50) with two bolts (40) and two nuts (30).
   (3) TORQUE the nuts (30) to between 110 and 95 lbf.in (1.24 and 1.07 m.daN ) T.
   (4) Remove the CAP - BLANKING and PLUG - BLANKING from the connectors and the receptacles.
   (5) Connect the connectors (10) and (20) to the visual indicator (60).
5. Close-up
Subtask 79-21-30-410-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021] 2026.04.01 03:39:21 UTC