W DOC AIRBUS | AMM A320F

Removal of the DPM Harness [CFMB]


TASK 79-21-30-000-002-A
Removal of the DPM Harness


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
PLIERS - CONNECTOR, JAW, SOFT
No specific
AR
PLUG - BLANKING
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
3. Job Set-up
Subtask 79-21-30-941-052-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 79-21-30-010-052-A ** ON A/C NOT FOR ALL
B. Open the fan cowl doors: (Ref. AMM TASK 71-13-00-010-040)
   (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
4. Procedure
Subtask 79-21-30-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the DPM harness
   (1) Disconnect the DPM harness from the visual indicator.
NOTE: Disconnect the magnetic chip detector harness from the DPM harness receptacle (150). Use PLIERS - CONNECTOR, JAW, SOFT only if necessary.
   (2) Remove the DPM harness as follows:
REMOVE
FROM
NOTE
lockwire
nut (140)
DPM harness
receptacle (150)
bracket (160)
(detail G)
DPM harness
clips (100) and (120)
on brackets (110) and
(130)
at the 8 o'clock
position on flanges
C and D (detail E
and F)
bolt (70)
clamp (80)
brackets (90)
at the 8 o'clock
position on flange
D (detail D)
bolt (40)
clamp (50)
brackets (60)
at the 8:30 o'clock
position on flange D
(detail C)
bolt (10)
clamp (20)
brackets (30)
at the 9 o'clock
position on flange
   (3) Put CAP - BLANKING and PLUG - BLANKING on the connectors and the receptacles.
[Rev.10 from 2021] 2026.04.01 03:39:22 UTC