Inspection/Check of the Oil Tank [CFMB]
TASK 79-11-10-200-002-A
Inspection/Check of the Oil Tank
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 79-11-10-941-057-A ** ON A/C NOT FOR ALL
Subtask 79-11-10-210-052-A ** ON A/C NOT FOR ALL
Subtask 79-11-10-410-057-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:39:03 UTC
Inspection/Check of the Oil Tank
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 79-00-00-210-003-A | Visual Inspection of the Oil System |
| TASK 79-11-10-300-003-A | Replacement of the O-ring of the Oil Tank Filler Cap |
| TASK 79-11-10-300-004-A | Replacement of the O-ring of the Oil Cap Assembly |
Subtask 79-11-10-941-057-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 79-11-10-010-058-A ** ON A/C NOT FOR ALL (1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
B. Open the fan cowl doors: (Ref. AMM TASK 71-13-00-010-040)
(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
4. Procedure(1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
Subtask 79-11-10-210-052-A ** ON A/C NOT FOR ALL
A. Inspect the following :
Subtask 79-11-10-210-053-A ** ON A/C NOT FOR ALL | INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.Tank envelope for : | | |
| Max. of 3 nicks or scratches 0.015 in. (0.38 mm) deep, 0.375 in. (9.53 mm) long, non joining provided damage cannot be felt with 0.030 in. (0.76 mm) ball scriber. | |
| Any number not breaking metal surface or affecting the capacity of the tank. | |
| None permitted | |
B. Check for leakage
5. Close-up| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.Check for leakage at following locations (Ref. AMM TASK 79-00-00-210-003): | | |
| None permitted | |
| None permitted | Check torque on fittings |
| None permitted | |
| Not serviceable | Repair (Ref. AMM TASK 79-11-10-300-003) or (Ref. AMM TASK 79-11-10-300-004). |
Subtask 79-11-10-410-057-A ** ON A/C NOT FOR ALL