Sealing of the Lockout-Pin Storage Location [IAE]
TASK 78-32-00-040-010-A
Sealing of the Lockout-Pin Storage Location
1. Reason for the Job
CDL 78-04
Lockout Pin
(old CDL reference: 78-2)
2. Job Set-up Information
A. Consumable Materials
B. Referenced Information
3. Job Set-up
Subtask 78-32-00-010-084-A ** ON A/C NOT FOR ALL
Subtask 78-32-00-040-064-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:27:51 UTC
Sealing of the Lockout-Pin Storage Location
1. Reason for the Job
CDL 78-04
Lockout Pin
(old CDL reference: 78-2)
2. Job Set-up Information
A. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V01-076) | Methyl Ethyl Ketone, Technical grade |
| (Material No.V02-006) | sealing tape |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 78-32-00-010-084-A ** ON A/C NOT FOR ALL
A. Visually find the storage location of the lockout pins.
4. ProcedureSubtask 78-32-00-040-064-A ** ON A/C NOT FOR ALL
A. Seal the lockout-pin storage location
(1) Clean the area around the lockout-pin storage location withV01-076 Methyl Ethyl Ketone, Technical grade and wipe with a dry Textile-Lint free Cotton - (Material No.14SBA1) .
(2) Put sealing tape (Material No.V02-006) on the lockout-pin storage location to make sure that no dirt goes into the orifice.
(1) Clean the area around the lockout-pin storage location with
(2) Put sealing tape (Material No.V02-006) on the lockout-pin storage location to make sure that no dirt goes into the orifice.
Lockout-Pin Storage Location