W DOC AIRBUS | AMM A320F

Reactivation of the Thrust Reverser System after the Island Fairing Installation [CFML]


TASK 78-30-00-440-814-A
Reactivation of the Thrust Reverser System after the Island Fairing Installation


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
ZONE: 400
1. Reason for the Job
CDL 78-31
Island Fairing
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 78-30-00-440-808-A
Reactivation of the Thrust Reverser System after Flight
TASK 78-32-53-400-802-A
Installation of the Island Fairings
3. Job Set-up
Subtask 78-30-00-941-103-A
A. Not applicable
4. Procedure
Subtask 78-30-00-400-051-A
A. Do as follow:
   (1) Make sure that the island fairing is installed (Ref. AMM TASK 78-32-53-400-802).
   (2) Do the reactivation of the thrust reverser for flight (Ref. AMM TASK 78-30-00-440-808).
[Rev.10 from 2021] 2026.04.01 03:34:55 UTC