Installation of the Centerbody [CFMI]
TASK 78-11-12-400-040-A
Installation of the Centerbody
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 78-11-12-860-052-A ** ON A/C NOT FOR ALL
Subtask 78-11-12-420-052-A ** ON A/C NOT FOR ALL
Subtask 78-11-12-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:59:06 UTC
Installation of the Centerbody
ZONE: 400
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 240 and 220 lbf.in (2.71 and 2.49 m.daN ) ![]() |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 10 | NUTS | AIPC 71-00-00-02-210 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 72-56-00-210-001-A | Inspection/Check of the Turbine Frame Assembly |
| TASK 78-11-11-000-040-A | Removal of the Core Nozzle Assembly |
| TASK 78-11-11-400-040-A | Installation of the Core Nozzle Assembly |
Subtask 78-11-12-860-052-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 78-11-12-010-054-A ** ON A/C NOT FOR ALL 4. Procedure(1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
(2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 78-11-12-420-052-A ** ON A/C NOT FOR ALL
A. Put the centerbody (30) on the studs in the engine flange.
Subtask 78-11-12-640-050-B ** ON A/C NOT FOR ALL NOTE: Due to interchangeability reasons between CFM56 5A and 5B engines some centerbodies have two rows of drain holes and can be installed in 5A engines.
B. Not applicable
Subtask 78-11-12-420-053-B ** ON A/C NOT FOR ALL C. Installation of the Centerbody
(1) Attach centerbody to the engine studs with new AIPC 71-00-00-02-210 NUTS (10) and washers (15).
(3) TORQUE nuts (10) to between 240 and 220 lbf.in (2.71 and 2.49 m.daN )
.
5. Close-up(1) Attach centerbody to the engine studs with new AIPC 71-00-00-02-210 NUTS (10) and washers (15).
NOTE: Make sure that you attach the centerbody to the engine with new nuts. Do not use nuts that were used before.
(2) Adjust the centerbody position to minimize flowpath mismatch. (3) TORQUE nuts (10) to between 240 and 220 lbf.in (2.71 and 2.49 m.daN )
. NOTE: If any anomaly occurs when removing nuts (loosing or broken stud), (Ref. AMM TASK 72-56-00-210-001) for serviceability or repair.
Subtask 78-11-12-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the core nozzle (Ref. AMM TASK 78-11-11-400-040).
(3) Remove the WARNING NOTICE(S).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the core nozzle (Ref. AMM TASK 78-11-11-400-040).
(3) Remove the WARNING NOTICE(S).
Centerbody