W DOC AIRBUS | AMM A320F

Removal of the Vibration Harness [IAE]


TASK 77-32-43-000-010-A
Removal of the Vibration Harness


ZONE: 400
FIN: 4004EV2 ** ON A/C NOT FOR ALL
FIN: 4004EV3 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 2M (6 FT)
No specific
AR
COVER - BLANKING
No specific
AR
WARNING NOTICE(S)
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-010-A
Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
3. Job Set-up
Subtask 77-32-43-941-050-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on the ENG panel 115VU:
     (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
   (2) Make sure that the engine 1 (2) shutdown occurred not less than 5 minutes before you do this procedure.
   (3) On the overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
     (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
Subtask 77-32-43-010-050-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Open the fan cowls (Ref. AMM TASK 71-13-00-010-010):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
   (2) Put the ACCESS PLATFORM 2M (6 FT) in position.
4. Procedure
Subtask 77-32-43-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Vibration Harness
   (1) Disconnect the electrical connectors (1) and (2):
     (a) Write the position of the electrical connectors (1) and (2).
NOTE: The connectors must be installed in the same position.
     (b) Disconnect the electrical connectors from the pylon.
   (2) Disconnect the electrical connectors (4) and (5):
     (a) Write the positions of the electrical connectors (4) and (5).
NOTE: The connectors must be installed in the same position.
     (b) Disconnect the electrical connectors at the connection with the vibration transducer.

PRE SB 71-0177 and PRE SB 71-0271

   (3) Remove the vibration harness:
     (a) Remove the nuts (8) and (12), bolts (6) and (10) and washers (13) and (14) at clipping positions B and C.
     (b) Remove the vibration harness (3).
   (4) Remove the transferable parts:
     (a) Remove the clips (7), (9) and (11).

END OF PRE SB 71-0177 and PRE SB 71-0271

POST SB 71-0177 and PRE SB 71-0271

   (5) Remove the vibration harness:
     (a) Remove the nuts (8) and (12), bolts (6) and (10) and washers (13) and (14) at clipping positions B, C, D and E.
     (b) Remove the vibration harness (3).
   (6) Remove the transferable parts:
     (a) Remove the clips (7) and (11) from the vibration harness (3) and the clips (15) and (17) from the EEC and ignition supply harness (16).

END OF POST SB 71-0177 and PRE SB 71-0271

POST SB 71-0177, POST SB 71-0271 and PRE SB 77-0014

   (7) Remove the vibration harness:
     (a) Remove the nuts (8) and (12), bolts (6), (10) and (18) and washers (13) and (14) at clipping positions C, D, E, F and G.
     (b) Remove the vibration harness (3).
   (8) Remove the transferable parts:
     (a) Remove the clips (7), (9) and (11) from the vibration harness (3) and the clips (15), (17) and (19) from the EEC and ignition supply harness (16).

END OF POST SB 71-0177, POST SB 71-0271 and PRE SB 77-0014

POST SB 71-0177, POST SB 71-0271 and POST SB 77-0014

   (9) Remove the vibration harness:
     (a) Remove the nuts (8) and (12), bolts (6), (10), (20), (22) and (24) and washers (13) and (14) and spacers (21) and (23) at clipping positions C, D, E, F and G.
     (b) Remove the vibration harness (3).
   (10) Remove the transferable parts:
     (a) Remove the clips (7), (9), (11) and (26) from the vibration harness (3) and the clips (15), (17) and (25) from the EEC and ignition supply harness (16).

END OF POST SB 71-0177, POST SB 71-0271 and POST SB 77-0014

Subtask 77-32-43-620-050-A ** ON A/C NOT FOR ALL
B. Install the applicable COVER - BLANKING on all the openings.
[Rev.10 from 2021] 2026.04.01 13:10:41 UTC