Discard Fan Shaft [CFMB]
TASK 72-21-00-920-002-B
Discard Fan Shaft
1. Reason for the Job
Refer to the MPD TASK: 722100-C2
DISCARD FAN SHAFT
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 72-21-00-010-063-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 72-21-00-020-078-A ** ON A/C NOT FOR ALL
Subtask 72-21-00-410-065-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:41:07 UTC
Discard Fan Shaft
1. Reason for the Job
Refer to the MPD TASK: 722100-C2
DISCARD FAN SHAFT
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 71-00-00-000-042-A | Removal of the Power Plant |
| TASK 71-00-00-000-042-A-01 | Removal of the Power Plant with the Engine Positioner TWW 75E (MIAG) |
| TASK 71-00-00-000-042-A-03 | Removal of the Power Plant with Jacxson Tool |
| TASK 71-00-00-400-042-A | Installation of the Power Plant |
| TASK 71-00-00-400-042-A-01 | Installation of the Power Plant with the Engine Positioner TWW 75E (MIAG) |
| TASK 71-00-00-400-042-A-03 | Installation of the Power Plant with Jacxson Tool |
Subtask 72-21-00-010-063-A ** ON A/C NOT FOR ALL 4. Procedure
Subtask 72-21-00-020-078-A ** ON A/C NOT FOR ALL
A. Remove and discard fan shaft ESM 722200 .
Subtask 72-21-00-420-084-A ** ON A/C NOT FOR ALL B. Install fan shaft ESM 722200 .
5. Close-upSubtask 72-21-00-410-065-A ** ON A/C NOT FOR ALL