Blending of the Stage 1 Booster Vane Assembly [CFMB]
TASK 72-21-00-320-004-A
Blending of the Stage 1 Booster Vane Assembly
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Referenced Information
3. Job Set-up
Subtask 72-21-00-941-076-A ** ON A/C NOT FOR ALL
Subtask 72-21-00-020-074-A ** ON A/C NOT FOR ALL Subtask 72-21-00-220-055-A ** ON A/C NOT FOR ALL
Subtask 72-21-00-420-078-A ** ON A/C NOT FOR ALL Subtask 72-21-00-869-071-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:41:22 UTC
Blending of the Stage 1 Booster Vane Assembly
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE |
| No specific | AR | FILE - SMOOTH |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.CP2189) | durite G422 |
| (Material No.CP2191) | durite G421 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-51-00-230-002-A | Fluorescent-Penetrant Inspection-Portable-Water Washable |
| TASK 72-21-00-000-007-A | Removal of the Fan Rotor Blades |
| TASK 72-21-00-400-007-A | Installation of the Fan Rotor Blades |
Subtask 72-21-00-941-076-A ** ON A/C NOT FOR ALL
A. Safety Precautions
(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
(4) Put an ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position.
4. Procedure(1) On the center pedestal, on the ENG panel 115VU:
(a) Put a WARNING NOTICE(S) to tell persons not to start the engine.
(2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do this procedure.
(3) On the overhead maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).
(4) Put an ACCESS PLATFORM 1M (3 FT)-ADJUSTABLE in position.
Subtask 72-21-00-020-074-A ** ON A/C NOT FOR ALL Subtask 72-21-00-220-055-A ** ON A/C NOT FOR ALL
B. Check for dimensions and location of defects on edge and compare with repair limits.
Subtask 72-21-00-320-053-A ** ON A/C NOT FOR ALL C. Perform blending of defects using a FILE - SMOOTH or strips of durite G422 (Material No.CP2189) or durite G421 (Material No.CP2191) , used dry.
(1) Remove a minimum of 0.01 in. (0.25 mm) of base metal in addition to depth of defect.
Subtask 72-21-00-230-053-A ** ON A/C NOT FOR ALL (1) Remove a minimum of 0.01 in. (0.25 mm) of base metal in addition to depth of defect.
D. Fluorescent penetrant inspect reworked area (Ref. AMM TASK 70-51-00-230-002). No crack is allowed.
5. Close-upSubtask 72-21-00-420-078-A ** ON A/C NOT FOR ALL Subtask 72-21-00-869-071-A ** ON A/C NOT FOR ALL
B. Make sure that the work area is clean and clear of tools and other items.
Subtask 72-21-00-942-070-A ** ON A/C NOT FOR ALL C. Close Access
(1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).
(1) Remove the access platform(s).
(2) Remove the WARNING NOTICE(S).
Blending of a Stage 1 Vane Assembly Leading Edge