W DOC AIRBUS | AMM A320F

Installation of the Starter Pad Oil Drain Tube [CFMB]


TASK 71-73-49-400-003-B
Installation of the Starter Pad Oil Drain Tube


FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 250 and 200 lbf.in (2.83 and 2.26 m.daN ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
FOR [1000EM1] (ENGINE-1)
437AL, 438AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
TASK 71-13-00-410-040-B
Closing of the Fan Cowl Doors
3. Job Set-up
Subtask 71-73-49-860-062-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) On the center pedestal, on the ENG panel 115VU, make sure that a WARNING NOTICE(S) is in position to tell persons not to start the engine.
   (2) On the overhead maintenance panel 50VU, make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off. Make sure that a WARNING NOTICE(S) is in position to tell persons not to energize the FADEC 1(2).
Subtask 71-73-49-010-080-A ** ON A/C NOT FOR ALL
B. Make sure that the fan cowl doors are open: (Ref. AMM TASK 71-13-00-010-040)
   (1) FOR [1000EM1] (ENGINE-1)
437AL 438AR
   (2) FOR [1000EM2] (ENGINE-2)
447AL 448AR
4. Procedure
Subtask 71-73-49-420-064-A ** ON A/C NOT FOR ALL
A. Installation of the Starter Pad Oil Drain Tube
   (1) Remove the protective covers from the drain reservoir, the starter pad drain, and starter pad oil drain tube (5).
   (2) Connect the drain tube (5) to the drain reservoir. Do not torque the coupling nut at this time.
   (3) Connect the drain tube (5) to the starter pad drain. Do not torque the coupling nut at this time.
   (4) Make sure that the drain tube (5) is aligned correctly on the engine.
   (5) Torque the drain tube coupling nuts.
CAUTION: USE A SECOND WRENCH TO HOLD THE FITTINGS WHEN YOU LOOSEN/TIGHTEN THE TUBE COUPLING NUTS. THIS PREVENTS DAMAGE TO THE TUBES.
     (a) TORQUE the drain tube (5) coupling nuts to between 250 and 200 lbf.in (2.83 and 2.26 m.daN ) T.
5. Close-up
Subtask 71-73-49-410-065-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021] 2026.04.01 02:27:40 UTC