Removal of the Protective Cover of the ACT-Equipment Support Door
TASK 57-17-11-000-003-A
Removal of the Protective Cover of the ACT-Equipment Support Door
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 57-17-11-010-054-A ** ON A/C NOT FOR ALL
Subtask 57-17-11-020-054-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:08:52 UTC
Removal of the Protective Cover of the ACT-Equipment Support Door
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 147 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| 148 | MAIN GEAR WELL AND HYDRAULIC COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
Subtask 57-17-11-010-054-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Open the MLG doors and install the safety devices (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone 147 or 148.
4. Procedure(1) Open the MLG doors and install the safety devices (Ref. AMM TASK 32-12-00-010-001).
(2) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at zone 147 or 148.
Subtask 57-17-11-020-054-A ** ON A/C NOT FOR ALL
A. Removal of the Protective Cover
(1) Remove the bolt (55), the washer (52) and disconnect the bonding strip (56).
(2) Remove the screws (53) and the washers (54).
(3) Remove the protective cover (51) from the ACT-equipment support door (57).
(1) Remove the bolt (55), the washer (52) and disconnect the bonding strip (56).
(2) Remove the screws (53) and the washers (54).
(3) Remove the protective cover (51) from the ACT-equipment support door (57).
Protective Cover