Preparation for Installation


TASK 55-10-11-560-001-A
Preparation for Installation


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: YOU MUST PUT ON AND ATTACH A SAFETY HARNESS BEFORE YOU START WORK:
  • ON THE THS OR IN THE REAR FUSELAGE
  • ON TOP OF THE WINGS OR PYLONS.
WITHOUT A SAFETY HARNESS, YOU CAN FALL. THIS CAN KILL YOU OR CAUSE YOU INJURY.
CAUTION: DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF CARBONFIBER REINFORCED PLASTIC.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
CRANE 1000KG (2200 LB)
No specific
1
SCALE 1000 KG (2200 LB)
98D27903500000
2
PIN-SIDE STICK LOCKING
98D55109005000
1
HTP SLING
98D55109005001
1
HTP SLING
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.08BBB1)
Non Aqueous Cleaner-- Petroleum Based -
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
3. Job Set-up
Subtask 55-10-11-860-053-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-001), (Ref. AMM TASK 29-10-00-864-002), (Ref. AMM TASK 29-10-00-864-003).
   (2) Make sure that the 98D27903500000 PIN-SIDE STICK LOCKING is in the CAPT and F/O side stick controllers.
   (3) Make sure that the warning notices are in position in the flight compartment to tell persons not to operate the flight controls.
   (4) Make sure that the warning notices are in position to tell persons not to operate the hydraulic systems.
   (5) Make sure that the access platforms are in position at zones 311/312 and 330/340.
4. Procedure
Subtask 55-10-11-110-050-A
A. Cleaning
   (1) Clean all connecting hardware with Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) .
Subtask 55-10-11-941-052-A
B. Attach Support Equipment
   (1) Put the CRANE 1000KG (2200 LB) with the 98D55109005000 HTP SLING or 98D55109005001 HTP SLING and a SCALE 1000 KG (2200 LB) in position. Attach the cables to the hoist fittings. When you remove the horizontal stabilizer, use a scale and monitor the weight. Do not lift with more than 700 kg (1543 lb).
   (2) Operate the CRANE 1000KG (2200 LB) and slowly tighten the sling cables, adjust as necessary to get an equal tension on the cables.